I have attached an updated budget and cost analysis for the above project.
At this point in time we need approval for the following items:
a) Item # 5 — Pluming at $ 59,886.75 for pumps and controllers for
connection to existing water distribution system.
b) Item # 6 — Electrical at $ 6,300 to connect power to well, pumps and
controllers, although this cost increased by $ 1,000 from the original
budget.
Even with the increased $ 1,000 for item # 6 and the additional testing costs
not originally budgeted for this project will still finish below the original
budget by about $ 4,500.
Sincerely
Emad Hanna