EFTA01013188
EFTA01013189 DataSet-9
EFTA01013191

EFTA01013189.pdf

DataSet-9 2 pages 681 words document
P17 V16 V11 P19 P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (681 words)
From: J cleevaration(iigmail.com> To: irallia>, Richard Kahn , Kyle reavis michael glidden Subject: Re: Barge Date: Tue, 18 Dec 2018 15:41:32 +0000 i thought mike needed help getting done with his punchlist. . check with ceciles recoommendatoin. On Tue, Dec 18, 2018 at 10:32 AM wrote: Do wish for me approach Barry Loudermilk? Regarding this work Sent from my iPhone Begin forwarded message: From: michael glidden Date: December 18, 2018 at 8:15:06 AM MST To: J <'eeva ation :mail.com> Cc: -,LSJ GSJ , Richard Kahn , Kyle reavis Subject: Re: Barge Good Morning. With regard to the barge, 3 weeks is the expected time needed for the exhaust work, the rub rail installation, and also inspect and address rudder alignment along with propeller inspections. There is also a list of general maintenance items Boscoe has that can be attended to while out of the water for that 3 weeks. With regard to the scope of electrical work to be done there are two items on LSJ that will be done with a combination of in house labor and local contractors. They would be the due bank from the generator building to the sea water intake building that will include the new fiber for the desal system and the repair of the 5 palms electric and fiber feeds due to your request that the work be done as soon as possible. The material for the duc bank is on island and the material list for 5 palms is going out today for pricing. I was going to have LSJ purchase all the material and have a local contractor install for which I am going to get two prices. The only area where the amount of potential work is likely to interest a stateside company would be GSJ. The issue with getting bids at this point is any scope of work that may be put into a list is simply an idea with no engineering or design to base an actual bid on. Before you can issue a scope of work to be bid on there needs to be a considerable amount of time and money spent with an engineering and design firm to produce drawings and/or designs, on paper, that contractors can then put a dollar figure to. I reached out to Springline for this specific purpose and they declined ,as have Jaredian Design. A stateside contractor may be interested in doing design-build and maybe that would be a path to explore but I do not have any connection with a company of that type. On Dec 17, 2018, at 4:31 PM, J <[email protected]> wrote: EFTA01013189 how many days neeeded. . what work still required barge. other boats ready more inportantly is where is the scope of elecrtic jobs needed as we discussed a week aglo On Mon, Dec 17, 2018 at 2:45 PM michael glidden > wrote: Good day. Is there any update as to when scheduling can be made for the maintenance and exhaust work needing to be done on Big N ? please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved please note The information contained in this communication is confidential, may be attorney-client privileged, may constitute inside information, and is intended only for the use of the addressee. It is the property of JEE Unauthorized use, disclosure or copying of this communication or any part thereof is strictly prohibited and may be unlawful. If you have received this communication in error, please notify us immediately by return e-mail or by e-mail to [email protected], and destroy this communication and all copies thereof, including all attachments. copyright -all rights reserved EFTA01013190
ℹ️ Document Details
SHA-256
02fcacd32b331b67cf31299e60cc411917084c09a22f94d4980d34c0c058c843
Bates Number
EFTA01013189
Dataset
DataSet-9
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!