EFTA02027232.pdf
👁 1
💬 0
📄 Extracted Text (166 words)
To: [email protected][[email protected]];
jeevacation mail.com '[email protected]]
From:
Sent: Wed 3/2/2011 9:22:12 PM
Subject: Gil update
Jeffrey,
Gulfstream is planning to work APU and boost pump on second shift today at 3pm, Quality Control is
researching and hopes to approve the T-Stat install that I brought with on plane, the paper work that came with
the Tstat is 1970 build date, three other Tstat's are listed in parts data base system, but are not ready to ship
since they are waiting bench testing,. There is also a pressure test of pneumatic system for Tstat, Gulfstream
is checking to see if this break out box is on hand in Long Beach,.
-Boost pump issue's will be addressed by Avionics tonight,. suspect corrosion on canon plug in wheel well, and
filter down stream of pump,. are area's we are looking, in addition to Circuit Breaker integrality, 50amp,.
If you approve of below floor inspection in Long Beach, Gulfstream can start Thursday,.
I will keep you posted,
thanks,
Larry
EFTA_R1_00535467
EFTA02027232
ℹ️ Document Details
SHA-256
03c8057394bc066cbf0332951d8ba6b4fa1323c19cb79b9c1e8150d3c8a5a6a4
Bates Number
EFTA02027232
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0