EFTA02599871
EFTA02599872 DataSet-11
EFTA02599877

EFTA02599872.pdf

DataSet-11 5 pages 987 words document
P23 D4 P17 D1 V16
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (987 words)
From: jeffrey E. <[email protected]> Sent: Thursday, August 2, 2018 6:53 PM To: Brice Gordon Subject: Re: ZM Water Development Update yes On Thu, Aug 2, 2018 at 2:38 PM, Brice Gordon <mailto > wrote: Good Afternoon attached for your Review http://www.waterreels.com/inde <http://www.water=eels.com/index2.ivnu> Can we m=ve forward with the purchase of one water reel for now,$17565.00 As stated there wi=l be possibly be a need for two units Can we proceed with the purchase of one unit? regards Brice For=arded From: Brice Gord=nrill.M Date: Mon, Jul 23, 2018 at=5:23 PM Subject: Re: ZM Water Development Update To: Rich Kahn «= href="mailt " target="_blank" Cc: Zorro Ranch <mailto Rich Attached proposal for the pu=chase of Water Reel Irrigation System for the Ranch I did not go to Delta CO as discuss, the owner of the Ranch t=ere called and informed me he had to shut his system down to to drought co=ditions. Also there where a lot of for=st fires in the area. As discuss, I di= speak with him at length regarding his operation and his overall impressi=n of the system. John Wendt has 2 x 20=TL units in operation , which cover 18 acres of pasture land . He highly recommends them and would be of assistan=e if need in the future. He also expla=ned how his system is setup, this was very helpful. What I propose the R=nch purchase one unit now and run it with existing pumps and pipe as a tes= to figure out the operational characteristics for the ranch. EFTA_R1_01786624 EFTA02599872 During the next few months design and install the N=w Pumps and piping system to support 2 units for next years irrigation sea=on. How do you wish to proceed. On Tue, Jul 3, 2018 at 10:56 AM, Bric= Gordon < nailto: :. > wrote: =div dir="ltr"> Rich FYI This what we are recommending fo= the irrigation system for the 20 acres under the Permit I plan this month,rto view a system in action in Delta CO After that I shouldn't be able to =igure how to apply this equipment to the Ranch's Requirements and desi=n the infrastructure to support. The costs for the T200L/580 equipped wit= the twin max sprinkler and the optional 13 h.p. electric start booster pump =ith the Honda engine would be $16,450. Shipping to Stanley, NM 87056=would be $600. All equipment is in stock, but pumps require a few days=lead time to configure and mount on the reels prior to shipping. The 13 h.p. =s self priming and can draft surface water as well as function as a closed=/div> li=e booster unit. 13 h.p. Electric start booster mounted on front of T=OOL/580 prior to shipping. Forwarded message From: Brice Gordon Ma=br>Date: Tue, Nov 21, 2017 at 5:34 PM Subject: Re: ZM Water Development=Update To: "jeffrey E." <jeevacation mail.com <mailto:jeevacation@gma=l.com» Cc: Rich Kahn &l= <mailto: », Zorro Ranch mailt Good afternoon By 11/1/2019 the Ranch needs to apply 68 AFA from the Wells (2) unde= Permit E7871, as of date the Ranch has achieved 50% of this amount. =div> The Attached map highlights in green the required 20 ac=es to be irrigated under Permit E7871. The terrain is undulating and secti=ns have been fenced. To meet the conditions of the Permit, The <=>proposed plan is to apply water to existing grass lands within the 20=acres for the grazing of live stock. Please note:=OSE will inspect PBU/Lands, operation and infrastructure under Permi= E7871, 2 EFTA_R1_01786625 EFTA02599873 The recommendation at this time its=to use a Water Reel Irrigation System, it appear this system should be abl= to handle the terrain. http://www.waterreels.com/index2.ivnu <http://www.wat=rreels.com/index2.ivnu> . This seems, the most logical a=d cost effective solution at this time. The Ranch would ne=d to Survey and Mow area to be irrigated. Install a network of f=eder pipes to different sections of the 20 acres to connect 2 water reel u=its In the mean time I will continue to research other options a=d start compiling final cost associated with Stage 3, using a Water Reel a=plication. Is this OK? R=gards Brice O= Fri, Nov 17, 2017 at 11:47 AM, Jeffrey E. <[email protected]</=» wrote: suggestions? <=div> g=; wrote: Attached photos for your reference: 1. On Site Fabrication & =nstallation of an Intake Screen for the Water coming from the Pond to the =istribution Pumps has been completed 2. Upon JCH's recommendation a Wate=fall has been Constructed at the Prevailing Wind Corner of the Pond. This =ill assist in the Aeration of the Water. There maybe a need for Flo=ting Solar Powered Sprinklers in the future. =div>3. Compaction of Pond Sides &=Base will be completed by the end of the week, this obviously help wi=h Water Retention 4. Engineeri=g & Design (JCH) of New Pump Skid & Distribution of Water from the=Pond to the PBU (20 acres) is in process. Proposal will be forwarded =nce received 5. Filling of the =rrigation Pond will commence next week & will continue during the=Winter. Transducer r=adings will be taken weekly to monitor water production vs demand.<=div> 3 EFTA_R1_01786626 EFTA02599874 </=iv> 6. The next stage is to Engin=er a Solution to Irrigate the 20 acres under the permit with the less amou=t of expenditure, but meeting the requirements of the OSE. Regards Brice Brice Gordon <=r> Stanley, NM LSJ-GSJ, USVI<=div> Ph: Brice Gordon Stanley, NM LSJ-GSJ, USVI Ph =/div> Brice Gordon Stanley, NM 4 EFTA_R1_01786627 EFTA02599875 LSJ-GSJ, USVI Ph 4>=A0 please note The information contained i= this communication is confidential, may be attorney-client privileged,=may constitute inside information, and is intended only for the use =f the addressee. It is the property of JEE Unauthorized use, disclos=re or copying of this communication or any part thereof is strictly pro=ibited and may be unlawful. If you have received this communication =n error, please notify us immediately by return e-mail or by e-mail to =a href="mailto:[email protected]" target="_blank">[email protected], and destroy this communication and all copies thereof, inc=uding all attachments. copyright -all rights reserved 5 EFTA_R1_01786628 EFTA02599876
ℹ️ Document Details
SHA-256
0487ed20a470e85b1ea7064058b83635c412408c2403ebefa0f9b73a9a9e45ce
Bates Number
EFTA02599872
Dataset
DataSet-11
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!