📄 Extracted Text (484 words)
-1 of 3- Ornouu. Moons
FD-302 (Rev. 5-8-10)
FEDERAL BUREAU OF INVESTIGATION
Date of entry 09/16/2021
On 9/09/2021 EDWARD BERTRAND, date of birth , cellular
telephone was interviewed at the St Thomas FBI office. Present
for the interview were SA SA , United
States Attorney , AUSA and
After being advised of the identity of the interviewing Agents and the
nature of the interview, BERTRAND provided the following information:
BERTRAND was employed by the VIRGIN ISLANDS WATER AND POWER AUTHORITY
(WAPA) from approximately 1990 through 2015. From 1990 until 2004 he was in
charge of mapping the power lines and water mains for WAPA. In 2005 he
became a Staking Engineer where his duties became surveying of new
construction sites, determining where new electrical meters were to be
installed, and how the power lines would be strung to that site. He was
also a Hurricane First Responder for WAPA throughout his employment.
Investigation on 09/09/2021 at St Thomas, Virgin Islands, United States (In Person)
File ft 194A-SJ-3269062 Dalechaflcd 09/13/2021
by
This document contains neither recommendations nor conclusions of the FBI. It is the moµ. of of the FBI and is loaned to your agency; it and its contents arc nor
to be distributed outside your agency.
EFTA00128758
FD-302a(Rev. 5-8-10)
194A-SJ-3269062
(U) Interview of EDWARD BERTRAND on
ComMusaion 01'M-302 of 9/09/2021 Am 09/09/2021 ,pays 2 of 3
. CLINTON HEDRINGTON was the Chief Operating Officer for Electric
Systems when the composite pole contract was being reviewed.
HEDRINGTON retired and now works directly for HAUGLAND. HEDRINGTON and
former WAPA employees, FELIX REY, NIEL VANTERPOOL, and CLAUDE RICHARDSON
have teamed up together and are in charge of HAUGLAND's contract for digging
trenches and placing the electric lines underground to mitigate storm damage
in the future.
)•
EFTA00128759
FD-302a (Rev. 5-8-10)
194A-SJ-3269062
(U) Interview of EDWARD BERTRAND on
Continuation ofFD-302 of 9/09/2021 i on 09/09/2021 i ns, 3 of 3
FELIX REY and HEDRINGTON were involved with double-dipping while employed
by WAPA. They would take private electrical jobs and use WAPA materials,
equipment, and personnel to complete these contracts while on WAPA time and
being paid for their normal responsibilities. REY was the electrician who
did most of the work on JEFFREY EPSTEIN's islands Little and Great St
James. REY and HEDRINGTON usually go a step further and wire the customers
directly to the power lines bypassing the meters so WAPA cannot bill for the
customer's usage. This bypassing of meters results in WAPA generating more
energy than they can bill for which is known as "Line Loss". WAPA passes
the cost of the Line Loss to all of the other customers through their
billing practices. The Virgin Islands DEPARTMENT OF PLANNING AND NATURAL
RESOURCES (DPNR) is required to keep all electrical permits on file. Many
of the permits will be signed off by HEDRINGTON and REY for HEDRINGTON and
REY to conduct the private electrical work.
EFTA00128760
ℹ️ Document Details
SHA-256
04c073b6436d470e363d894c12945df3b7e7447e2a3dd44e80a742382701678d
Bates Number
EFTA00128758
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0