👁 1
💬 0
📄 Extracted Text (270 words)
From: Richard Kahn
To: Jeffrey Epstein <[email protected]>
Subject: Flagpole pool
Date: Tue, 02 Oct 2018 18:05:36 +0000
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
to
fa
eel
Begin forwarded message:
From: Rick Rossi <
Subject: pool
Date: October 2, 2018 at 2:04:37 PM EDT
To: Richard Kahn < , brice gordon >, Kyle reavis
Good day all , Just wanted to give an update on the status of the pool.
The plaster work went very well , however in the acid wash and power washing of the pool in preparation of
putting the Kristacure ( sealer ) we felt that the pool would benefit from being filled with water first for a few
weeks .( This is the normal start up procedure ) During this time have Smiley brush it daily or as often as he's
able , to even up the surface a little better so when it's sealed the pool looks the best it can.
The Blue and other colored plasters are very difficult to get the finish uniform and I'm confident this additional
step before sealing will do the trick.
It is important that the PH stay at or close to 7.0 for 30 days .( this is done with the addition of Muratic acid )
Additionally chlorine can be added on Friday . No calcium is to be used. The salt system should not be used
during this time as well.
After this period the pool can then be drained and sealed as planned.
Please call me or email if you have any questions.
Thank you
Rick Rossi
EFTA01021130
ℹ️ Document Details
SHA-256
060dfe5ce66409c9c9698980961b257eaad583d9e5eb910068b3aa426432ada6
Bates Number
EFTA01021130
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0