EFTA00788425
EFTA00788436 DataSet-9
EFTA00788439

EFTA00788436.pdf

DataSet-9 3 pages 452 words document
P17 V15 V16 V11 V13
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (452 words)
LSJE, LLC 6100 Red Hook Quarters, Suite B-3. St. Thomas. VI 00802-1348 Phone: 340-775-2525 E-mail: Check Request Form Date of Request: 1/14/18 Amount Requested: $9.000.00 B.V.I. Painters Ltd PO Box 824 Payee: Road Town Payee Address: Tortola Payee Contact: British Virgin Islands ❑ Check box if GL coding is split Invoke NJMemo: rst 3094 50% deposit to begin work - raise engine bracket, interior and exterior paint job Nautica GL Description: GL Memo: 60252n GI- Code: GL Amount: rs.000.00 Invoice NJMemo: GL Description: GL Memo: GL Code: GL Amount: ❑ Check box if additional pages are included Requesting local check. Transportation to BVI scheduled for 11/20/18. contingent on Little C engine install going smoothly 11/19/18. Completion date contingent on weather. Other Notes/ Instructions: Date Approved: 11/14/18 Approved by: EFTA00788436 1 B.V.I. Painters Ltd Estimate B.y.I. P.O. Box 824, Road Town, Tortola e mr — British Virgin Islands. Date Estimate No. Tel: 284 494 4365 11/10/18 3094 Reno art our: Name/Address Nautica RIB Little Saint James Description Quantity Cost Total Labour and Material cost estimate to: 0.00 1.) Remove and reinstall engine 0.00 0.00 . Raise engine Bracket ( owner will provide specs for engine bracket) 2. Repair area from inspection cut 0.00 . Prep area and manufracture new pieces to fill holes . Inspection holes must be cut in a 40 degree angle to fit manufactured pieces 3. Interior Floor 0.00 . Remove soft decking . Inspect and repair damage areas . Fill and Fair . Tape and mask . Spray two coats of primer . Sand primer . Apply two coats of top coat . Sand . Change tape . Apply two more coats of top coat . Tape off smooth Areas and apply two coats in non-skid area with sillicone beads 4. Topside-: From the waterline to the toe rail 0.00 . Repairs/cover holes from bow railing . Sand entire topside . Fill and fair . Tape and mask . Spray two coats of primer 50% deposit before start balance due on completion. Total Pace 1 EFTA00788437 B.V.I. Painters Ltd Estimate 8.v f. P.O. Box 824, Road Town, Tortola British Virgin Islands. Date Estimate No. 41 N1 Tel: 284 494 4365 11/10/18 3094 mrsanis Name/Address Nautica RIB Little Saint James Description Quantity Cost Total . Sand Primer 5. Bottom- Below waterline 0.00 . Sand entire bottom . Prep any damage areas and fair with epoxy filler . Sand . Apply inter protect where necessary . Then apply two coats of Antifouling 6. Repaint engine covers 0.00 Estimated labour and material cost to complete the above mention Jobs 18,000.00 18,000.00 Please note that this is only an estimate 50% deposit before start balance due on completion. Total $18,000.00 Pale 2 EFTA00788438
ℹ️ Document Details
SHA-256
0635dee29128a7c2834e991e6d460a36d19f2f150dd83bab17a1b855370b59d9
Bates Number
EFTA00788436
Dataset
DataSet-9
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!