1-5:f 5o/ar Notes
Comments:
• LSJ Current system is a 480 volt industrial 3-phase system —AC which is equivalent to the
amps that WAPA current brings to the Island
o Current Usage
• 2000 KWH/day.
• 730,000 KWH year
• Avg. Monthly bill $26,000
• Solar is a 12 volt DC system. The following are not conducive to solar systems:
o Major motor loads
o Halogen lightening
o AC systems
• Intent of a solar system is either a
o Central system powering entire island, or
o Point of use system where each structure has an individual point of distribution. Solar
would be installed at the point of use as a kind of net metering system.
• Start with outlying structures;
• Kite house
• Gym
• Five Palms
• Manager's Cottage
• Office Pavillion
• Small solar capacity; water heaters
• Location of the panels
o Need large surface area (i.e., roof tops)
• Wood shop
• Mechanical
• Generator building
• Ground
• Space needed
o 30 KW = 3,200 sq ft
o 450KW = 21,000 sq ft
• Permitting
o Not needed if installed on existing rooftops
o Needed is installed at ground level
EFTA00583122
1-5:f 5o/ar Notes
Project : 3 source power
Location: Lovango Island
Contractor : Solar - Depot LLC: Robert Seton contact. 1-707-992-3100 CA company. Not
sure if you can go direct as Dan Boyd of Lovango has the distributorship - he is
green. Electrician Chris Meyers on St. John - smart but one man operation.
Wind - Talco Electronics. Tal Mamo 1-877-448-2525. Very pleased so far will be
doing the final installation at the end of the month.
Cost : Approximate equipment only was Solar - $175,000, Wind - $125,000
Size: 3200 square ft.
Power Generation: 30 KW
Project Description: The Lovango Island Project installed a 3 source power system to sustain 10
residential family homes. There is no WAPA source to the Island. The solar
component is approx 30 kilowatts of power. There are 130 solar panels . There
is battery bank system with approx cost of 65K. The wind component is approx
11 kilowatts. The system works on a multi cluster box which auto switches
between the 3 source, solar, wind, generator. They are working the glitches out
but over all working well.
Project: Ground-mounted Photovoltaic Solar Panel System
Location: Cyril E. King Airport
Contractor: All Around System
Veteran's General Contracting, Inc
Cost: $2,900,000
Size: 21,000 square feet (1,500ft X 14ft)
Power Generation: 450 KW
Cost Savings: $52,500/month
Project Description: The Virgin Islands Port Authority in partnership with the VI Energy
Office and WAPA wanted to find ways to reduce the government's
oil-based energy. The lifespan of the panels is 20 years and it took
three months to install. It has been reported that this is working well.
EFTA00583123
ℹ️ Document Details
SHA-256
0651beee30574c180452567d9ea40c3293c295bfcfd0dc618e722121766edfc1
Bates Number
EFTA00583122
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0