EFTA01827409
EFTA01827410 DataSet-10
EFTA01827411

EFTA01827410.pdf

DataSet-10 1 page 228 words document
V16 P17 P22
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (228 words)
To: Andrew Lev From: Jeffrey Epstein Sent: Wed 4/1512009 9:52:16 PM Subject: Re: LSJ Hammam hasan „re landscape-- this is a total waste of time-- I'm done/ there is no new idea. the drawings simply reiterate what is already there, with the addition of calling them terraces.. the plants arc for later.. there is no information that is uscfull whatsoever„ i have said that the views arc NOT to be considered.. as they arc always availble as you drive or walk around the island. IT has been over a month and there is not one idea.. there is no sculpture or shape to the top of the hill„ there no sense of rythm place compostion, I'm sorry.. I have more information on a local project that i am doing in 2 hrs, than i have receveid on this project in 7 weeks.. On Wcd, Apr 15, 2009 at 5:37 PM, Andrew Levy wrote: Dear Jeffrey, On behalf of Hasan... Attached you will find -folder of 5 diagrams that pertain to strategies for the whole island. -folder of 4 interior entry circulations options (see image for option 4) We are currently working on entry approach and entry courtyard (which may be a homogenous relationship) see also attached two images of entry approach to the Alhambra. Hasan can be reached at 9am tomorrow in his office. Best, Andrew EFTA_R1_00202534 EFTA01827410
ℹ️ Document Details
SHA-256
065ed25a8c1d19f0995e00546df3323bb4b70f7a4c9b5f7ce07e703a7de7bfee
Bates Number
EFTA01827410
Dataset
DataSet-10
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!