To: Jeffrey EpsteinUeevacationagmail.comj
From: Daphne Wallace
Sent Mon 8/5/2013 10:25:44 PM
Subject Re:
Greetings Sir,
I will pursue Florida. Jimmy is already doing so, he has called two of his contacts in the Miami
area for recommendations.
Jimmy says once the permit is obtained, 4 days to form the road, 2-3 days to pour - a total of 6-7
days. If he has to get the concrete trucks one at a time, it may take a little longer, but 10 days is
the extreme worst case scenerio.
Respectfully,
Daphne
On Mon, Aug 5, 2013 at 5:15 PM, Jeffrey Epstein <jeevacationegmail.com> wrote:
there are many steel co fro hangarss, check,florida... how long will road take after reciving
approval?
On Mon, Aug 5, 2013 at 11:27 AM, Daphne Wallace -c =. wrote:
Greetings Mr. Epstein,
Jimmy is still planning to begin working on LSJ week of 8/19. He is so far on schedule to
conclude his other projects on St. Thomas, so barring weather, he will be starting with the tile
work week of 8/19.
I. Tile work - the tiles are scheduled to arrive at the port in DR on 8/15. EDA to sail from
Santo Domingo is 8/22, EDA on STT 8/24, will can clear and pick up on 8/26. This schedule
is perfect for Jimmy, who anticipates that the slab pour for the tile will take 6-7 days, and
after that the tiler comes in and he will take approximately 2 weeks. The thinset will be on
STT on 8/10, Jimmy gave me the parts order for the pool drain this morning, I sent the quote
to Jimmy to confirm it has everything, and will order once he confirms today. The grout will
be purchased locally, I will call Floor Factory to reserve the quantity once Jimmy gives it to
me this week. Jimmy says this project, barring weather, is still estimated at 3 weeks.
2. Gym road - spoke with the surveyor this morning. They should have the drawings this week.
Jimmy has offered to push through the application with his contacts at DPNR, we just have
to get the application in order. I am reaching out to John at Jaredian Design for guidance.
Jimmy says he can still begin the prep work for the road pour once he is on site, in
anticipation of the permit coming through. Still scheduled to do the road work along with
the tile work, barring weather, and any permitting delays.
EFTA_R1_00434597
EFTA01960366
3. Five Palms Dome - Samson broke the quote out - Materials $7,845 (nuts, bolts, framing
aluminum, plate and shipping costs associated with constructing and installing the dome) and
Labor $8,640 (3 men @ $90/per hr @ 8 hrs/day @ 4 days). Jimmy will call Samson to
discuss. There is no start date for this project.
4. Main Entrance - Jimmy and the masons plan to come to LSJ on Wednesday morning for a
site visit so they can discuss options of stone for your review. There is no start date for this
project.
5. Waterfall - Jimmy needs advisement on what you would like for the waterfall. There is no
start date for this project.
6. Tennis court - There is no start date for this project.
7. Ncw garage for Mechanical area - Jimmy needs advisement on location and dimensions so
we can seek a quote. There is no start date for this project.
8. Ncw hangar - Jimmy and I have had no success with Capitol Steel Structures, so Jimmy is
calling his contact in Texas, and I will follow up to get them the specs for the building. There
is no start date for this project.
Respectfully,
Daphne
On Sun, Aug 4, 2013 at 8:27 AM, Jeffrey Epstein <jeevacationra'email.com> wrote:
equipment? real schedule for jimmys work, start date tinish.etc
******************************** ***************************
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
EFTA_R1_00434598
EFTA01960367
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by c-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00434599
EFTA01960368
ℹ️ Document Details
SHA-256
06eccbf2a03c773ba4b55489c4407544b0893d71b62cb81448d63af2679959d1
Bates Number
EFTA01960366
Dataset
DataSet-10
Type
document
Pages
3
💬 Comments 0