📄 Extracted Text (1,595 words)
From: "Jeffrey E." <[email protected]>
To: Richard Kahn
Subject: Re: Designer - Gregory
Date: Wed, 01 Oct 2014 15:12:28 +0000
yes
On Wed, Oct 1, 2014 at 11:05 AM, Richard Kahn < > wrote:
i spoke with Russell and he is looking for the following:
a) some deposit or advance to Gregory of 15k for October's work (if you agree what entity should i have pay
and what amount)
b) understanding that he will earn a 20% fee or 3,000 for October (if he is hired full time then it will be
deducted from total fee of 20% of annual salary)
please advise
thanks
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue 4th Floor
New York, NY 10022
Begin forwarded message:
From:
Subject: Re: Russell„
Date: September 30, 2014 at 3:02:42 PM EDT
To: Russell
Cc: Rich Kahn
HI Russell...thanks for all the explanation...I think this is where I need to step aside and let our accounting
department work on this with you...I have CC;d our head of accounting, Rich Kahn...
thanks,
On Sep 30, 2014, at 12:21 PM, <
wrote:
Hi Leslie,. Good Morning Just to keep you in the loop , Gregory was contacted directly from Jeffery to work on
some additional sketches for the additional month for 15K, He is very ,very happy and of course wants to continue
etc, He asked me for some clarification and it brings up a few questions on all fronts, as noted this is a role that we
are recruiting for on a permanent side, Gregory was looking for a salary in the 200k plus range, etc, He asked me
EFTA00869327
about the status of the role, It gets a bit fuzzy because He was recruited with the intention of a perm role , By being
asked to work on additional sketches for another month, it is changing the status from a perm role to a contract
role. He seems to be willing to run with the punches but if the status changes then it either presents itself with
hiring him directly for an additional project at 15k for the month, with that said then beyond the initial project for
the qualifying sketches which I took myself out of the equation at 1k, then any additional project work , there is a
project placement fee attached to it at 20% which is standard, Normally if it is direct work and he is working with his
company and not on the payroll then design deposits are usually the norm in that type of work, We do work on the
role on our end for perm with time recruiting cost etc, The role can at times change from perm to contract but with
that said then it goes on our temp payroll with a SO % markup meaning,( If we were to pay someone 20 hr then we
would bill 30 hr.. etc„ covering payroll, unemployment insurance insurance, and some profit). Paying Gregory 15K
on the temp payroll would incur paying him more so he nets 15K and then adding the markup , in this case being a
short duration, would not make any sense,
Gregory wants to be there does not want to rock the boat, because he wants the perm position, His thought and
everyone's thought is this is a perm opening .By asking to do initial work at 15k a month, projected out brings the
role to 180K, Which on the perm side would incur a recruiting fee of 36k. As mentioned , I took myself out of the
initial temp fees for the initial sketches to qualify for the perm job, (with the hopes of him getting it), however if he
needs to continue for additional projects then the recruiting fee would apply at a prorated basis for the portion that
he works. I would highly recommend a 20% project wage fee vs putting him on the temp payroll that would incur so
much more, He wanted to know If the proposed work is 1k for the initial sketches and 15K for the additional work
and if a partial deposit could be made of the 15k side as time will go into the project.
On our side from an expectation stand point , perm fees or project fees are 20% of the wages and temp if put on our
payroll Is 50% markup as explained earlier, At this juncture, if you could find out from JE , if he plans on hiring him?
Giving him a temp project , paying direct or with placement fee prorated from the project limitation?
I know this is a lot to absorb in one shot, I bring it up because the expectation was based on the qualifying sketches
that he would either be hired if the sketches were used or he would pay Gregory the 1k. The dynamics changed
because In asking him to go beyond the initial sketches, then we of course remain in the loop, for the additional
work, I opted out of the temp fees for the initial sketches as it is nominal and we were hoping for a perm placement,
Which is 20% of the annual salary. Again Gregory asked about the deposit (as that is the norm) if he is contracted
directly, However, on our end we cannot go from a perm recruiting search to straight project direct without a
prorated project hire fee, Normally it is always done on temp payroll, which would be too costly, in this case, a
direct flat project fee in this case would be 3k for the month (hence 20% of 15k).
The goal here is for a perm hire on all ends, Going month to month, we do remain in the loop on a prorated basis,
Please share your thoughts with me, I try to be as flexible as I can on our end, we do have a staff etc, so I do have to
keep to normal standards to a point„ I did not want to have a misinterpretation being I dropped the temp fees for
the initial sketches, In asking Gregory to do initial work it opens the door for the status of the role to change on all
fronts, We can work with it on our end by keeping the costs down with a20% staffing project fee for month to
month or a 20% full time placement fee, as opposed to putting someone on the contract payroll, I bring this up
because El not sure if Jeffery is aware of all of this, By being a contingency search firm we can change and work
with changes, but we need to keep the terms clear if we go beyond the initial sketches, The concern here is it then
becomes unclear of it being a perm role or contract role, Contract roles go on our payroll, Perm roles have perm
fees, trial roles have project fees for the duration of the term.
To sum it up, Please advise as I see it getting complicated,,, he hires him outright (being all the recruitment work has
already been done already), It only is getting confusing as it is changing from Gregory having the role outright based
on the initial sketches to doing some additional work , with that said we do participate in it, but the question is do
you put someone on the contract payroll, which can be costly, Recruitment is what we do, I want to make it fair for
all. Gregory really wants to be there and does not want to rock the boat, he did ask about a deposit on future work,
but yet was a bit unclear of the terms, and status, On our end we have simple terms 20% fee on all wages, or if not
then on the payroll with a temp markup (50% is standard in the industry), but by asking him to do additional work,
it can place him in either one of the categories, and keep him hanging on his status of whether he is a perm hire, In
EFTA00869328
addition , I did not want to create a scenario where although I eliminated the temp fees on the initial project (which
is fine), but if we continue beyond the initial then we are still in the loop as the work was done and it creates more
moving forward,
I do have a few ideas to help make it work, but I wanted to check your thoughts, the expectation here was that he
would have been hired or not, he wants to be here„ And obviously we do run a business as well and our
participation which is a given, we do not want to impact his ability to continue„ we just want to do what's fair all
around,.. We can be flexible of course moving forward., but if we go forward , we just need a game plan and to be
concise on his terms if we change his status,
Please advise,
Russell
Russell Katulak
lemstone Associates
Partner
380 Lexington Ave
New York, NY 10168
Suite 1700
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
EFTA00869329
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA00869330
ℹ️ Document Details
SHA-256
078fb76236fdb429fdbda4b8a4726e66dedafaedd4e07313e5fb6e3149ffe42b
Bates Number
EFTA00869327
Dataset
DataSet-9
Document Type
document
Pages
4
Comments 0