EFTA00583408
EFTA00583409 DataSet-9
EFTA00583410

EFTA00583409.pdf

DataSet-9 1 page 257 words document
P17 V16 P23 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (257 words)
9 East 71" street Daily Report 6/18/18 • Sent E-Mail to Mr. Epstein discussing the Master Bedroom air flow and the installation issues with installing a split system ac unit in the 3f1 electric closet .1 called A.D Winston to look into alterations of the cove supply air diffusers and the floor vents to be extended to redirect the air flow in the bedroom across the bed. • Kitchen Exhaust system installation, completed the wiring for both kitchen VFD's waiting for mechanical technologies to send start up technician to program units to operate both kitchen hood exhausts. • Con Edison steam shutdown for 9 East 71" street from Friday June 21" to Tuesday June 25th 8:00am sent E-Mail showing hot water service interruption and room temperature control issues during shutdown. • Emergency Hot Water Backup system working on electrical contactors and controls found contactors beyond repair, need replacement. Called AO Smith I can to order new heating contactors total for three 15,000 watt part #9005013250 around $400.00 with next day shipping this should get the heating unit operational for the June 21" to June 25th Con Edison steam shutdown please approve so I can order and install. • Contractor to come to 71" to look melted corian panel behind stove tomorrow 6 /19/13 and give a proposal for replacement. • AC-1 worked on fan motor problem , stuck in fast speed will not switch over to slow speed checked all electric connections ,all good I will contact motor manufacturer support to see what causes this problem. EFTA00583409
ℹ️ Document Details
SHA-256
07df94ae980a963b0aa4e26da42d5c699694f06e45cfc2efba60b733a3c8f26a
Bates Number
EFTA00583409
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!