EFTA02501618.pdf
👁 1
💬 0
📄 Extracted Text (236 words)
From: Daphne Wallace <
Sent: Monday, May 11, 2015 4:38 PM
To: Jeffrey Epstein
Cc: Rich Kahn; ann rodriquez
Subject: Fwd: LS1 Vehicular and Woodworking Building.
Greetings Sir,
JP Oriel will allow the =ermit application for the new Mechanical/Wreck shop building to be file as=a Minor Permit, in
the position you suggested.
Re=pectfully, Daphne
- Forwarded message
From: John =. Woods, AlA < <mailtc
Date: Mon, May 11, 2015=at 11:12 AM
Subject: LSJ Vehicular and Woodworking Building.
To: Dap=ne Wallace mailto >>
Cc: Cecile de Jongh
Daphne,</=>
Goo= news! J.P. Oriol of CZM has informed me they will accept the replacement =ehicular and woodworking building as
a Minor Permit. It will be configured=as requested by Mr. Epstein parallel to the shore, near the line of natura=
abutment. What you need to do now is get the required paperwork from the =t. Governor's office so that we can file the
permit. We will revis= the preliminary design so that you can get pricing. The permit itself wil= take about 60 days to be
approved. The other two structures on top of the=R.O. and Generator Buildings will be done as permit modifications.
Once yo= get the modification form signed by Mr. Epstein, we can file that. It wil= take approximately 2 — 3 weeks to be
approved.
<= class="MsoNormal">
JPVV./u>
<http://www.avast.com/> This email is free from viruses and malware because avast! Antivirus
<http://w=w.avast.com/> protection is active.
EFTA_R1_01629415
EFTA02501618
ℹ️ Document Details
SHA-256
082509c029cd22110e75d8991676baa9d90c2db2ce196d153211194286e26607
Bates Number
EFTA02501618
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0