EFTA00665950.pdf

DataSet-9 1 page 120 words document
P23
👁 1 💬 0
📄 Extracted Text (120 words)
From: "Gary Kemey" To: "Jeffrey Epstein" <[email protected]> Cc: "Emad Hanna" aa Subject: Date: Mon, 16 May 2011 18:38:33 +0000 schedule for the 4th Main pool the building slab will be poured and block going up the pool equipment will be installed and water in pool the retaining walls around cottage will be up the deck will be concrete,ready to lay tile(tile comes after the building is stoned) still on target for 10/3 Flag pole pool the building will be framed in and plastering underway the pool equipment will be in and water in the pool (assumes we get tile selection) the deck will be concrete(tile happens after shelter and plaster) walls will be underway still on target for 9/15 EFTA00665950
ℹ️ Document Details
SHA-256
09b68762baa014b50f90fb31937460f51e53ea7cfd2f9898cb6fd6030c0dc5ae
Bates Number
EFTA00665950
Dataset
DataSet-9
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!