EFTA02656542.pdf
👁 1
💬 0
📄 Extracted Text (192 words)
From: Ramon Alonso <
Sent: Monday, May 21,11/1”
To: jeffrey E.
Subject: Re:
I propose that we focus on finishing the ma=ter plan concept and define locations, sizes and general style of each
buil=ing. Once we have that approved, I will Mark everything physically on=site so we can make sure that
locations/elevations are 100% accurate. =div>
After that we can continue detailing each space to suit y=ur exact needs in the next phase (schematic design).
Ramon Alonso
<https://docs.google.com/a/radyca.com/uc?id=080=t2Xiu_APTREN0Nm1WMDZJNTA&export=download>
On May 21, 2018, at 2:08 PM, jeffrey E. <[email protected]> wrote:
what do you propo=e as today we are at literally five months ago.
p=ease note
The information contained in this communication is
con=idential, may be attorney-client privileged, may
constitute inside infor=ation, and is intended only for
the use of the addressee. It is the prop=rty of
JEE
Unauthorized use, disclosure or copying of this
communi=ation or any part thereof is strictly prohibited
and may be unlawful. If=you have received this
communication in error, please notify us immediat=ly by
return e-mail or by e-mail to [email protected] <mailto:jeevacation@gmail.=om> , and
destroy this commun=cation and all copies thereof,
including all attachments. copyright -all=rights reserved
EFTA_R1_01902286
EFTA02656542
ℹ️ Document Details
SHA-256
0a143bf9334d6b6063dbc593384727e079f892299f4537bf948a936b5afb6a03
Bates Number
EFTA02656542
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0