👁 1
💬 0
📄 Extracted Text (361 words)
To: [email protected]@gmail.com];
jeevacation mail.com 'eevacation@gmaitcom]
From:
Sent: Mon 10/24/2011 3:22:04 PM
Subject: Re: Maintenance schedule for planes / heli
I just heard from Universal, shooting was moved earlier to tomorrow, they decided to use John Travolta's Boeing
707 for the film shoot, since its perfect vintage for the series,..they know we are interested and available for
future filming, and will call us on next opportunity,
thx
Larry
In a message dated 10/24/2011 1:50:09 A.M. Eastern Daylight Time, [email protected] writes:
727 filming?
Sony for all the typos .Sent from my iPhone
On Oct 23, 2011. at 10:21 PM, Lvjet . wrote:
Jeffrey,
Lesley, could you put these dates in Je's calendar?
maintenance schedule coming due for flight dept:
Gulfstream is due 72 Month inspection: Feb 28th, 2012 t's the largest inspection, down
time is only estimate, depends on corrosion etc, 5 week down time for starters.
Boeing 727 is due light C check Feb 28th, 2012 and side brace actuator, due Jan 19th,
2012 down time 2 1/2 week's estimate,
From Larry Morrison:
Larry V,
As we discussed, the following is the upcoming maintenance for the 727 and GIIB.
Boeing 727: MLG Side Brace Actuator AD (SB) due 1/19/12 Part 1 thru 3 of SB
were complied at Ovhl, Part 4 is new and just requires the sidebrace actuator to go to
a shop for a minor mod. I can try to get an extension from the FAA to align with C
Check (although no guarantee being AD driven) / C 2C due 2/28112 This is our lightest
of the C Checks, consisting of heavy on the fore and aft wing spar, under galley and
lays.
Gulfstream IIB: 72mo. inspection due 2/28/12 (heavy structural inspection)
Recommendation is to do the 727 check early in conjunction with the MLG AD to get it
up and ready before GIIB goes for Maint. My concern is more with the extensive 72mo.
on the GIIB than the lighter 727 C Check.
I will be sending packages for both aircraft to be quoted soon. Hope this helps.
Larry Morrison
Bell 407 Annual inspection is Due April, 1st 2012, FYI (down time 2 weeks) budget
$25,000.00
EFTA_R1_00530117
EFTA02023542
ℹ️ Document Details
SHA-256
0a6e639cfa315d4dfef8aa72cd0961a44af4578cbdf6d34ac893092fb5e60a0f
Bates Number
EFTA02023542
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0