EFTA00802104
EFTA00802115 DataSet-9
EFTA00802116

EFTA00802115.pdf

DataSet-9 1 page 155 words document
V16 P23 P17
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (155 words)
Kyle W Reavis Construction Manager Little St James / Greater St James Congratulations: This letter is to serve as an invitation to bid for the scopes of work listed below on Either GSJ or LSJ. You need to provide start dates, scope item duration, that will be included in the project schedule. Any issues with procurement of materials or schedule impacts must be presented immediately as to no effect other trades or the scheduled opening of the project. Job Name: "Flag Pole Pool" The SCOPE OF WORK to price is as follows: • Demolition of Existing Pool Shelter • Construction of New Pool Shelter (20'x40') • Design of New Shelter • Painting by Owner (Include as Add / Alt) Delays or cost impact submitted will be reviewed and rejected, or accepted as a change order with directions on how to proceed issued by the CM. Sincerely, Kyle W Reavis ' nager LSJ - GSJ EFTA00802115
ℹ️ Document Details
SHA-256
0a72537815b78e65d20392cdd722efd8af4a72b4eeb9c9565fb950f6353144e3
Bates Number
EFTA00802115
Dataset
DataSet-9
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!