EFTA00835018.pdf

DataSet-9 2 pages 386 words document
👁 1 💬 0
📄 Extracted Text (386 words)
From: Richard Kahn To: Bob Petersen Cc: ann rodriquez Subject: Re: TSG - LSJ Design Approach Date: Fri, 05 Feb 2016 15:00:56 +0000 Thank you for excellent recap. Please coordinate your timing for Tuesday am with Anna Look forward to hearing about your findings next week.. Richard Kahn HBRK Associates Inc. 575 Lexington Avenue 4th Floor 10022 to fax cell On Feb 5, 2016, at 9:29 AM, Bob Petersen > wrote: Richard, Thanks for the call yesterday. Am recapping the approach we used at LSJ that worked out well for your consideration on your future project: 2007 - TSG designed and installed a 25,000 gpd "temporary" RO plant in a 20 ft container and delivered it to the island. At this time, a larger intake pipe, intake screen and pumping station was designed and built for the final build out plant. The intake pipe and screen were installed under the main dock by affixing it to the dock pilings. Valving was installed at the container to allow the seawater pipes to be extended to the main maintenance facility that was under consideration at that time. The 25K plant was equipped with air conditioning and served as a feed water supply for the concrete plant and irrigation. 2011— TSG designs and installs a 90,000 gpd plant in the Main maintenance facility. This is now the primary water supply for the island. The 25,000 gpd plant was retired and removed from the island. This approach gets a water supply on the island sooner and , being containerized, is able to be moved if design considerations require and can be collocated with a containerized diesel genset. Another suggestion is to use a temporary bladder tank for water storage. On Mosquito Island in the BVI, we used the phased approach above and installed a temporary bladder tank that held 15,000 gallons . The tank is about 30 X 25 ft and can be placed on a liner on flat ground. Of course, a second concept is to design and install the full size plant but this requires the complete infrastructure of the island to be designed and frozen so the location and size of the plant is fixed. I will have more input after our site visit on Tuesday. Best Regards, Bob Petersen — TSG Water Resources USVI EFTA00835018 EFTA00835019
ℹ️ Document Details
SHA-256
0ab357358ac1a556508d8f227ca77d8d560df51886addba99efb03648eb9009b
Bates Number
EFTA00835018
Dataset
DataSet-9
Type
document
Pages
2

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!