From: Ann Rodriquez
To: Jeffrey <[email protected]>
Cc: Rich Kahn
Subject: Ken Floyd: LSJ Road paving
Date: Wed, 14 Jun 2017 12:39:07 +0000
Ann R.
Begin forwarded message:
From: Ken Floyd
Date: June 14, 2017 at 8:26:37 AM AST
To: Ann Rodriquez
Subject: Re: LSJ MAP
Good morning, Ann
I have 2 questions for you.
What are you going to use for a barge and will it go from STX to LSJ?
Are you willing to purchase a used Volumetric Concrete Batching truck? This will allow us to mix concrete directly on the island and be
used on both islands. There is one on St. Croix we are thinking of purchasing.
Thank you,
Ken
On Mon, Jun 12, 2017 at 8:40 AM, Ken Floyd wrote:
Good morning, Ann:
I will get the list and timeline to you ASAP. It will take a few days.
Sincerely,
Ken
On Fri, Jun 9, 2017 at 9:42 PM, Ann Rodriquez wrote:
Hi Mr. Floyd,
The Owner would like to proceed with LSJ paving asap. Can you please send me an itemized list with
pricing and a timeline from start to finish?
Thank you,
Ann R.
On Jun 9, 2017, at 11:28 AM, Ken Floyd wrote:
Good Morning, Ann,
Please do not take offense at anything I am writing here, as you asked me to put down my issues in an email. Primarily, because
we could not have a correspondence call via phone.
It appears we are again at the same place, at a different time.
The only difference is the idea of, "Economy of scale", by holding out the possibility of doing GSG as a reason to give a lower
price.
EFTA00644616
The idea behind a better price due to increased quantities is logical; if the extra work is included in the schedule of values and
Schedule of work.
It appears the viability of the project hinges on the ability of the owner to maintain a location of privacy, a position of which I
respect and am totally committed.
However, requirements such as these do not mix well with expedition and even more important to me, quality.
In Civil work, especially involving a product such as asphalt, which needs to be protected from fast running water and standing
water in order to last, the underlying surface and water travel need to be addressed prior to application of the final surface course.
The roads on both Islands were not cut with that in mind and need some intense mitigation. From the formation of retention ponds
to swales and low-water crossings.
All of the items will be outlined and a unit cost applied to each activity, which will make any approved changes transparent
regarding cost. This will be in our,
Speed and Quality come together at a premium and I cannot put together a price based on Speed, Quality, Economy of Scale and
maintaining privacy for a project in a piecemeal fashion.
I take great pride in performing our work in the best quality possible.
If we perform this work, it will be after an approved price and Project Schedule. In order to provide you with these items, I need
to know what issues I will be faced with and the issues which are not negotiable.
I have no idea ofhow often or how much notice is or can be provided regarding when privacy is necessary, but it would be
productive to stop work on one island while performing work on the one next door. This is just one proposal.
I am going to have to finish up due to other appointments.
I hope I did not give the impression I don't want to do your project. The opposite is the truth. Want to do an organized, clean and
quality job, nothing less.
Sincerely,
Ken Floyd
On Wed, Jun 7, 2017 at 2:47 PM, Ann Rodriquez H wrote:
Hi Ken,
The owner would like to see the turn out of LSJ "Road Paving" before we proceed with GSJ
We would like to start LSJ asap. Can you please revisit your bid and give us the best deal possible as
we would also like to proceed with GSJ right after our LSJ paving project.
Please advise,
Ann R.
On Jun 7, 2017, at 12:33 PM, Ken Floyd wrote:
Good Afternoon,
Both of these sketches are labeled LSG, which I take to mean they are not of GSG. Could I get a scale drawing of the Topo
for GSG?
Thank you very much,
Ken Floyd
On Wed, Jun 7, 2017 at 12:11 PM, Jermainc Ruan wrote:
With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT
Cell:
EFTA00644617
Off:
With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT
Cell:
Off:
With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT
Cell:
Off:
With Respect,
Kenneth Floyd, Virgin Islands Paving
General Manager, STT
Cell:
Off:
EFTA00644618
ℹ️ Document Details
SHA-256
0ae975d4d2fe445677a8a9a995c3405d2999fb46f01a370e31c08526589da854
Bates Number
EFTA00644616
Dataset
DataSet-9
Type
document
Pages
3
💬 Comments 0