📄 Extracted Text (251 words)
From: "Jeffrey E." <[email protected]>
To: John Christensen
Subject: Re: MBR housekeeper steps revisited
Date: Mon, 03 Apr 2017 16:40:13 +0000
narrow and planted at landing wide at steps ok, just water runoff should be considered
On Mon, Apr 3, 2017 at 5:14 PM, John Christensen < > wrote:
Jeffrey,
We looked at the housekeeping steps for ways to hide the path, and have the following suggestions.
Coral stone pavers removed so the landing area by your MBR door is only gravel as previous, placing potted palm to
mask the stair from your view
I did a quick photoshop sketch showing:
A narrower step by moving the outer step wall closer to MBR wall, creating 2 feet wide steps
A smaller landing area, increasing the gravel area, thus making steps less visible.
The final view with a generic palm inserted. (Not the final pot, nor palm, just for effect)
Would this be acceptable or is it still too visible?
Thank you
John
EFTA01050600
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01050601
ℹ️ Document Details
SHA-256
0bf45441d869f4c4e2019f076e40eae0795b628b411ea93c49b151489b8b8bbf
Bates Number
EFTA01050600
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0