👁 1
💬 0
📄 Extracted Text (298 words)
From: Larry Visoski
To: Je vacation <jeevacationggmail.com>
Subject: Fwd: JEGE contract
Date: Thu, 15 May 2014 13:07:11 +0000
Just received this from Larry Wright, who is Ashley's contact / broker.
Sent from my iPhone
Begin forwarded message:
From: "Larry Wright_Gmail" <
Date: May 15, 2014 at 8:58:51 AM EDT
To: "John Ashley"
Cc: "'Gary Anzalone"
Subject: JEGE contract
John —
Here are the comments I had regarding the contract —
The contract requires that full funds be in escrow on May 20th. This is 2 12 / - 3 weeks before
the aircraft is even ready to fly and accept. This should be changed to 5 business days before
the aircraft is tendered for the test flight as notified in writing by the repair facility (Stambaugh).
The contract notes that the spares for the aircraft are included. We need to make sure that we
have thirty days to arrange for the movement of the spares from their current location.
A spec sheet and an inventory of the spares should be included as an appendix to the
contract.
- We have discussed the transition of the Pt. 125 certificate. The contract should state that
appropriate management personnel on the certificate as recognized by the FAA will remain on
the certificate to allow for an orderly transition to new personnel acceptable to the FAA. There
can be a time limit to it but we need to transition the certificate in a manner that will allow the
new personnel time to review and fully understand the company ops and maintenance
manuals as well as meet and get to know the PO1 and PMI for the certificate to that the
transition will not cause a lot of problems with the FAA.
Let me know if you have any questions.
Thanks,
Larry
EFTA00688940
ℹ️ Document Details
SHA-256
0c0ae3071dd561bbabfe438b6320f9def0fb512fc8e49af0c6d5810cab2bfd64
Bates Number
EFTA00688940
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0