EFTA01181644.pdf
👁 1
💬 0
📄 Extracted Text (256 words)
From:
To: Jeffrey Epstein <[email protected]>
Cc: Rich Kahn
Subject: Big N
Date: Thu, 04 Oct 2012 00:01:38 +0000
Attachments:
Inline-Images: bargel.jpg; barge2jpg
Jeffrey
As requested attached are 3 quotes for work on Big N, also the present deck and storage conditions
1st quote from Bob Kassner, not to exceed price of $32,600.00
2nd quote from Sub Base Dry Dock for an estimated cost of $40,000.00
3rd quote from Island Rigging for hydraulic hose and fitting install, this work would be and in addition to
BOTH quotes
Please note the I also recieved a bid for Stainless steel fitting for 24K, I did not submit, fittings would out last
hoses!!!
please add $2,500.00 for misc items such as wiring, gauges, fire extinguishes, paint etc, all labor would be in
house (LSJ Employees)
My recommendation after reviewing scope of work is
Have Bob Kassner do the work, LSJ to support and supply hydraulic fittings and hoses
Barge would be located at LSJ or Red Hook depending on weather and work.
This would allow us to oversee work and assist when needed directly
At this time the Bilge cleaning, doors, plex glass windows have been completed, but as the photos show the rest
of the barge needs TLC
Monday 8th Big N will be brought to LSJ, complete clean will take place, it will take 2 days ( in house labor)
Carlos will be in charge
I can forward pictures of present condition, wiring, hydraulic fittings etc, if required.
For your consideration
USVI
N w M xic
EFTA01181644
EFTA01181645
ℹ️ Document Details
SHA-256
0c167356a946278f15efca7a0ac73926b1aaf8bed8956b77272a1ca59e1d2ad1
Bates Number
EFTA01181644
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0