📄 Extracted Text (596 words)
6
REPORT
Appendix B
Progress Report
Company, to confirm that
This progress report, prepared and provided to the Investor by the
objectives described below:
since the SPA, the Company has successfully achieved all of the
Business side:
completion of integration
1) First Responder (Police or MDA or Fire department etc.) —
first responder and
and production implementation of the Reporty system with
report from the scene back to
providing their local teams/volunteers option to stream and
the command and control center. — Done with MDA
Residence) that provide
2) Local municipality — At least two local authorities (50,000+
internal urban uses.
their employees (at least 300 people in each city) the system for
Done — Modiin, Ra'anana
In addition:
- Process with Haifa and Hadera.
• Finished Installation in Israeli biggest news channel (Channel 2).
Singapore: Started corporation with NCS
few demo to Microsoft
In advanced process with Microsoft (Proposal was sent, after
Physical security HQ)
▪ Started discussion with USER global security team for pilot.
Technoloeical side:
Streaming
e acoustic echo which appears on the
1) Implement echo cancellation module and reduc
.
operator side due to echo created on the mobile side. Done
s.
2) Reduce audio stream latency to 600ms. Done < 600m
In addition:
- Reporty Router (First Version) — Done
- Adaptive bitrate - Done
- Hardware accelerated video encoding - Done
Scanned by CamScanner
EFTA01116572
REPORTY
Indoor Positioning
for active and passive raw RF
1) Design and develop a scalable framework and data-models
signals collection and storing, correlated with Geo-Tagged locations. Done
locations, which
2) Completing harvesting of RF and geo-tagged data of at least 30 unique
the
could be apartments, stores, offices, etc. as a preliminary step before integrating
indoor positioning algorithm in Reporty App. Done
Social Features
I) Implement the Guardians Feature
a. Set your Reporteam - Done
b. Chat capability with Reporteam - Done
c. Option for choosing your rules using the rule engine — Done
In addition:
- Instant messaging — Done
- Organization ID — Done
- SpotMe — In progress — will be ready within 1 Month.
C2I
1) Chat capability between the dispatcher and the reporter - Done
2) Ability for pulling a detailed reporter profile at the C2I during a report — Done
In addition:
Auto update — Done
Mobile device signal strength bar — Done
Scalability and Robustness
1) Full mobile support and QA tested functionality on IOS mobile phones and 5 top Android
mobile devices in Israel - Done
2) Implementing an auto-scalable cloud computing and storage solution that would support
all of Reporty's mobile active users by leveraging on-demand IaaS providers - Done
3) Having a robust and commercially available version of the Reporty App, which shall
utilize at high level of performance and substantially free of defects all of the aforesaid
functionalities and designs. — Done
In addition:
- Monitoring system — Automatic alert in case of failure — Done
Scanned by CamScanner
EFTA01116573
- Load testing system - Done
Patents:
Stage.
1. Automatic load balancing - Sustaining activity during high network strain — PCT
by
2. Repony router — the ability to optimize voice and video communication in real time
identifying the most stable method of communication - Provisional
Sincerely
off In in inua
9 .9.D
Reporty and Security Ltd.
I. the undersigned, Mr. Gal Kaminka hereby confirm that I have read this report, examined and
reviewed the relevant technology/system of the Company and therefor certify that, to my best
professional judgment, the statements and descriptions set forth therein are correct and accurate
Scanned by CamScanner
EFTA01116574
ℹ️ Document Details
SHA-256
0c55c84be55b8b920ddc9c43aa459775f0156be2f69b9c6b96f618861db425e5
Bates Number
EFTA01116572
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0