EFTA02520944
EFTA02520945 DataSet-11
EFTA02520949

EFTA02520945.pdf

DataSet-11 4 pages 465 words document
P17 V16 P22 P19 V11
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (465 words)
From: Richard Kahn Sent: Friday, February 23, 2018 10:03 PM To: jeffrey E. Cc: Brice Gordon Subject: Fwd: I.s.j tile job both chillax and waterproofing were not on original bid =eceived from brice by luciano on 1/26/2018 Richard Kahn HBRK Associates Inc. 575 =exington Avenue 4th Floor New York, NY 10022 tel fa ce Begin forwarded message: From: =/b>Russell Hernandez Subject: =/b>Fwd: I.s.j tile =ob Date: =/b>February 23, 2018 at 4:51:42 PM =ST To: qb>"jeffrey E. Cc: First revised proposal for tile Russell Hernandez Begin forwarded message: 1 EFTA_R1_01657945 EFTA02520945 Date: February 23, 2018 at 4:23:43 PM =ST To: lemmond luciano Subject: Re: I.s.j tile job Thank you! Sent from my =Phone On Feb 23, 2018, at 4:17 PM, <rnailtc wrote: CHILAX remove all existing floor =ile- ( coral stone) and place in dumpster, 324 sf TOTAL $ =10 dray =ack-level entire floor 324 sf, TOTAL $ 810 WATERPROOFING well be done by sf, $ =.75 per sf this include materials (water proof) Begin forwarded =essage: From: brice gordo Subject: Fwd: I.s.j tile job Date: January 31, 2018 at 10:55:02 AM EST To: Rich Kahn Forwarded message - From: Iemmond Date: =ri, Jan 26, 2018 at 7:39 AM Subject: I.s.j tile job To: 2 EFTA_R1_01657946 EFTA02520946 </=iv> </=iv> =nbsp; =nbsp; FLOORS remove all existing floor tile- (coral stone) of =abins, (cabanas) #1 # 2 # 3 and # 4 and place in dumpster, 1,654 =f TOTAL $ 4,135 dray pack-level all floors 1,654 sf, TOTAL $ 4,135 install 1,654 sf =f porcelain tile 18x18 on a straight pattern with 1/8 of an inch joint =OTAL 9,097 =nbsp; =nbsp; POOL CABANA remove all existing floor tile- ( coral stone) and =lace in dumpster, 496 sf TOTAL $ 1,240 dray pack-level entire floor 496 sf, =OTAL $ 1,240 install 496 sf of Carrera barbel tile 18x18 or 12x12 on = straight pattern TOTAL $ 3,7201 =nbsp; =nbsp; STAF =OTAGE remove all existing floor tile- in the porche, and =lace in dumpster, 569 sf TOTAL $ 1,422 dray pack-level entire floor 569sf, =OTAL $ 1,422 install 569sf of porcelain tile 18x18 on a straight =attern with 1/8 of an inch joint TOTAL $ 3,129 =nbsp; =nbsp; =nbsp; CABANA-EAST remove all existing floor tile- ( coral stone) and =lace in dumpster, 153 sf TOTAL $ 382 dray pack-level entire floor 153sf, =OTAL $ 382 install 153 sf of porcelain tile 18x18 on a =traight pattern with 1/8 of an inch joint TOTAL $ =41 =nbsp; =nbsp; BATHROOM CABANA # = remove all walls and shower floor tile- (coral stone) =32 sf of cabin (cabanas) # EAST place in dumpster, TOTAL $ =95 3 EFTA_R1_01657947 EFTA02520947 Will BE =ONE BY THE HOUR WIHICH IS $30 =ER HR FOR HELPER AND 65 FOR INSTALER, PLUS =ATERIALS Brice Gordon 4 EFTA_R1_01657948 EFTA02520948
ℹ️ Document Details
SHA-256
0c8a2bf07a5e2bc1516ba61f323f104659daf1be6b218c77892fdae44721b723
Bates Number
EFTA02520945
Dataset
DataSet-11
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!