📄 Extracted Text (322 words)
To: atusyllieevacationggmaii.comi
From:
Sent Sat 1/12/2013 7:03:54 PM
Subject: Paris Painting
Cost
I have been trying to get a fixed number from Valdson
He says he cannot give me a quote before they start as he is unsure exactly how long it will take
etc.
He said it will be about half of what was quoted from the previous people (Pintos people I think).
I have asked to sec if she has this previous quote.
He says Mr Epstein says it would be fine / said Valdson you decide, and he doesnt understand
why I am now requesting a number for Rich Kahn.
Time Frame
The time frame he has given for the upstairs section is 5 weeks. This seems ridiculous. It is the
small office and only the ceiling in the bedroom as the walls have fabric on them. And the little
corridor. I understand they will have to prepare and cover the fabric walls carefully but 5 weeks
still sounds too long.
To give us some idea. Michael was averaging 3 days to paint our studio apartments and 4-5 days
to paint the 1 bedrooms. Ion painted Svets 1 bedroom in 5-6 days and I think he did Sarahs entire
apartment in Venetian plaster in 3 weeks.
Valdson has also told me that he would prefer to do the upstairs section first and then do the
gym/guest bathroom at a later stage. For 2 reasons - I. You can see whether you are happy with
the upstairs before proceeding further. (the upstairs is the majority of the work though.) 2. He
thinks the damage in the gym is dampness and would like to wait for a couple of months until the
weather is better.
The painting should obviously be done while you are not in Paris. You are set to go on the 24th
and Valdson is taking leave from the 15th February, which takes us into April.
EFTA_R1_00347792
EFTA01911322
ℹ️ Document Details
SHA-256
0ca95b83d06442d041b1d7ae4e16652fbf71c861e99e003ad62b5a5e44571a9a
Bates Number
EFTA01911322
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0