EFTA00901781.pdf
👁 1
💬 0
📄 Extracted Text (193 words)
From: Darren Indyke <
To: Jeffrey Epstein <[email protected]>
Subject: Fwd: Found Leak-pies
Date: Tue, 11 Jan 2011 19:50:55 +0000
Inline-Images: IMG_20110111_115915jpg; 039.JPG; 038.JPG
Sent from my iPhone
Begin forwarded message:
From: Wendy Martinez <
Date: January 11, 2011 2:17:11 PM EST
To: Darren Indyke
Subject: Fwd: Found Leak-pics
Forwarded messa e
From: Wendy Martinez
Date: Tue, Jan 11, 2011 at 12:16 PM
Subject: Found Leak-pies
To: Karen
Here are pies of the location of the leak and the actual leak inside the wall from the camera. It is the top of the
water hammer arrestor that is split. Can be fixed my Marty cutting the pipe and replacing the cap. New
insulation (and more of it) is reccomended by Marty.
The wall and insulation are soaked and with our frigid temps we are concerned that more will be damaged with
the exposure. The air inside the wall is reading 30 degrees with the outside temp in the Estancia reading 18 -
23 degrees.
A 2'x3' hole will need to be put in the wall. Marty will be gone next week but is available this week to fix it.
Thank you
Wendy
EFTA00901781
EFTA00901782
ℹ️ Document Details
SHA-256
0cc7c61f7abef5b0834ce27afb9dd0ab0d57216e718571bb29910e893aed10d8
Bates Number
EFTA00901781
Dataset
DataSet-9
Type
document
Pages
2
💬 Comments 0