EFTA01038363.pdf
📄 Extracted Text (278 words)
From: "Jeffrey E." <[email protected]>
To: Daphne Wallace
Subject: Re: Proposed Landing Site for WAPA link between LSJ and GSJ - August 10, 2017
Date: Thu, 10 Aug 2017 20:16:17 +0000
all good
On Thu, Aug 10, 2017 at 1:27 PM, Daphne Wallace < > wrote:
Greetings Sir,
Attached below is Mr. Fraguela's and Mr. Felix Rey's (WAPA) proposed landing site on GSJ for the electrical
power cable from LSJ.
They are proposing following the same route as the cable from St. Thomas, and coming onto GSJ at a point
that will avoid disturbing the area that is known to contain an underwater grass that is protected.
Mr. Fraguela recommends digging a trench 3 feet in depth that will bring the cable from the point of landing to
the point that you have indicated you wish to have the main power vault constructed.
With you approval of Mr. Fraguela's proposal, he is requesting Ms. Dempsey dive the area to confirm that the
grass is not present. Plan drawings can then be created, sent to WAPA for final review and approval, and the
permit application submitted to DPNR.
Respectfully submitted,
Daphne
please note
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
JEE
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to jeevacation®gmail.com, and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA01038363
ℹ️ Document Details
SHA-256
0e4f0bd75f9736c8c5b068853ae17a70eabf8999d477ef13d77b87a201a54789
Bates Number
EFTA01038363
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0