EFTA02607142.pdf
👁 1
💬 0
📄 Extracted Text (273 words)
From: Richard Kahn <
Sent: Saturday, January 5, 2019 10:02 AM
To: Jeffrey Epstein
Subject: Fwd: damages to Cabana #3
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Jay Knoepfel <[email protected] <mailto:[email protected]»
Date: January 4, 2019 at 9:38:46 PM EST
To: Richard Kahn < <mailto », Kyle reavis
<mailto », brice gordon <
<mailto:
Subject: damages to Cabana #3
I have met with Kyle and Rolland to get a first hand accounting of the water flooding in cabana #3. Rolland
has compiled a detailed account of the history. Both Kyle and Rolland believe that a water hammering increased the
pressure in the pipes and caused one of the pipes fittings to fail. I believe that the failure in that particular fitting is not
necessarily the fault of human error, it is the result of general construction activities. Materials fail and break due to
faulty manufacturing. In this case it was the water pressure that exceeded the capabilities of the pipe fitting to
maintain its connection to the straight piece of pipe adjoining it. This is one of the reasons we would carry liability
insurance. We will need to capture all the expenses related to this incident so we can enter it in our claim.
Please note that we take responsibility for this damage and will pay to have it restored. JPK always stands by
its work to give its customers the best quality and service. We have already repaired the plumbing and the walls that
were necessary to open up to get to the plumbing.
We apologize for the inconvenience that this event has caused.
EFTA_R1_01798803
EFTA02607142
thank you
2
EFTA_R1_01798804
EFTA02607143
ℹ️ Document Details
SHA-256
0f16c300f133d33c31ab35bfc0c6b066dd22c9058dba4960397ad398bf663763
Bates Number
EFTA02607142
Dataset
DataSet-11
Type
document
Pages
2
💬 Comments 0