📄 Extracted Text (294 words)
Michael J. Glidden Proposal
Electrical Services
4716 Estate Mafolic #12
St. Thomas VI 00802
4-6-11
To: Gary Kerney
Bill RowIm
Lafeyette Construction
Re: Flagpole Pool Work
Gentlemen,
The following is my proposal for the work to be done with relation to the feeder
installation (Labor Only), the pump room electrical and the cabana electrical.
Lsj will supply all conduit and wire fbr the 1500' feeder from the woodshop to the new
flag pole pool pump mom/elcctric room. MG electric will install all conduit and wire
along with supplying a new 150 amp, 480 volt main breaker to he to he installed in the
woodshop 480 panel.
Lsj will also supply man holes and hand holes to be installed by MG electric along the
feeder route.
LSJ is to supply all excavation, concrete encasement and backfill material and labor.
MG electric will supply and install a 200 amp, 480 volt distribution panel, a 75 kva
transformer and a 200 amp, 208 volt distribution panel in the new pump room along with
lighting and electrical connections/circuits to all equipment within the pump room
including circuits for existing flag pole lighting and new pool cabana.
MG electric will supply and install a 3 phase, 70 amp feed to a new distribution panel to
be located in the laundry room of the new cabana. MG electric will supply and install all
devices, light fixtures(excluding interior and exterior wall sconces and vanity lights) and
a/c condenser/air handler circuits as required. Switching, lighting and power lay-out as
per Gamier drawing(no date) and Gary Kerney.
"Fleeter Installation $ 18,375.00
*Service Equip./Pump Rim Misc. $ 11,870.00
*Cabana $ 33,079.00
*Total Cost $ 63,324.00 + 112/5'0O
If you have any questions please contact me at Ce5S ( 041Qc{:($713 SO)
Thank You, tS2014.—
EFTA01069592
ℹ️ Document Details
SHA-256
0f8f04bbebe68f6975344a4aa9f90119a84625e5cb3043cacc35a9ddc3d92ca0
Bates Number
EFTA01069592
Dataset
DataSet-9
Document Type
document
Pages
1
Comments 0