📄 Extracted Text (415 words)
From: Lvjet
Sent: Monday, November 28, 2011 3:12 AM
To: [email protected]
Subject: 6727 update
Jeffrey,
Terak from Qatar told me that his chairman will be in West Palm Beach =n December 3rd to view the Boeing 727 and
possibly take a demo flight= Chicago was mentioned as a possible destination. No firm demo flight date=has been
established. I will gain your approval first,.
I will have more info early this week,. Don Bass and Terak requested a=4 year maintenance budget from Larry Morrison,.
here is the email that Morrion prepared,. It has not been sent to buye=,. only fwd to Don Bass, at this time,.
Dear Don,
Per your request, and as follow up to our teleconference last week, pl=ase see the following maintenance projections.
While reviewing, please kee= in mind that these are only projected estimates, and do not include line =aintenance and
normal wear items. As well, keep in mind that these project=ons are based on average findings and do not include
extenuating circumsta=ces.
January 2012: C 2C Check (General De=cription: Inspection Below Galleys, Lavatory's and Emergency Exits, Fore a=d Aft
Wing Spars) Estimated Cost: $420,000 3 weeks down t=me
February 2013: Lower Lobe and Bilge Inspectio=: (General Description: Requires removal and installation of Aux.=Fuel
Tank System / History of this aircraft has had minimal findings in th=se zones, however, the removal and installation of
the tank system is Iabo= intensive, 36mo. recurring). $300,000 3 weeks down time =note: all eleven fuel cells were
overhauled at last removal, thus cell con=itions should be good) .
Engine No.2 HPC AD2003-12-07 (amd. 39-13192) (8 yr re=urring) (Due 7/27/2013) $350,000.4 weeks down time
(howe=er there are exchange options available for the -7B engine).
February 2014: C Check (General Desc=iption: Two year items) Estimated Cost $175,000 2 weeks d=wn time. Engines
No.1and No,3 HPC AD 2003-16-05 (amd.39-=3258) (9 yr recurring) $350,000 each, 4 weeks down time (=ote: Lease as
well as exchange engines are difficult to come by do to inte=mediate case modifications required for the Super 27. In
addition exchange=engines are not recommended do to the very low hours and cycles on the cur=ent set of engines).
I hope this helps to define the upcoming major maintenance events for =9081E. Once the 2014 Maintenance is complete
the aircraft will be back on =chedule with the MSG3 multiple of two program. In essence, all subsequent =hecks will be
every 24 months, the following being 2016.
Best Regards,
Larry Morrison
Director of Maintence / JEGE Inc.
EFTA_R1_01397842
EFTA02382049
ℹ️ Document Details
SHA-256
112b586c921f78b05ad8c4c1af525ee133672df3e7c3d100cdadbdd5bd3ab7ad
Bates Number
EFTA02382049
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0