📄 Extracted Text (562 words)
From: jeffrey E. <[email protected]>
Sent: Saturday, April 21, 2018 1:45 PM
To: Eric Roth
Subject: Re: Open item list and estimated pricing
can you call . all about right
On Sat, Ap= 21, 2018 at 9:41 AM, Eric Roth wrote:<=r>
Jeffrey,
Many of the items below require your d=finition / confirmation. We have done our best to provide a financia=
"feel" for these items. Others are straightforward (airstair steps).
Furthermore, materials need to be sele=ted for the window line, grospoint for closets, etc...=/span>
Have a great day!=/p>
Eric
apan style="font-size:16.0pt;font-family:"HOK Sans Pro Bold",sa=s-seritcolor:Ita6a6a6">Plan D, LLC
1. Lay seat in wood $4,600 - $6,0=0
2. Toilet paper cover — N=ed to discuss design. $$1,200 - $2,400?
3. Mirror re-do — $No cha=ge
4. Aft lay sink drain handle need= rubber and tightening $900 - $1,400
5. Coffee maker area — th=re is no existing fan in this area
EFTA_R1_01568186
EFTA02461923
6. Aft galley kettle steam =93 $ we do not have a "fix" for removing the steam generat=d from the kettle
7. Fabricate new lightweight gall=y sink cover - $ No charge
8. Divan mod to be determined and=materials $96,700• Does not include R/H mid cabin removal of existing
diva.? Create new lower sidewall and ledge? Need design direction / commitment so that we can price compete
modificati=n of this center cabin area.
9. New carpet - $39,800./u>
10. Re-veneer fwd side of pocket d=or — no peep hole or vacant sign — need definition. =omplete door?
11. Re-veneer cabin side of aft la= door cover vacant sign $800 - $1,200 if just a cover plate?=/span>
12. Insulate fwd lay door? Need to=discuss potential design $$1,800 - $2,600?
13. Remove windowline monitors and=recover $21,360
14. Remove table and lower side pa=el "bumpout" at the #3 seat locations $24,300
15. Fabricate new veneer T.V. cove= on the L/H forward cabin bulkhead $3,600
16. iPhone charger at the R/H #2 l=dge like on GIV $3,400
17. Raise arms on co-pilot seat to=match pilot seat, make pilot seat softer and stop pilot seat from
shaking.=$1,600 - $2,100
18. Fabricate leather arm rest cov=rs for all cabin single seats $4,840
19. Stabilize jump seat $T&M 5=00 - $1,500?
20. New airstair covers $4,660<=u>
21. Tighten latches $ T&M =80 estimate $800 - $1,400
22. Replace cabin upwash / downwas= lights with new LED lighting $46,700
23. Replace grospoint on three (3)=closets, $17,600
24. Remove blow out covers at R/H#.3 & L/H #3 seats $This must stay and are required by Gulfstream=u>
25. Carry on work station $Needs t= be designed to identify pricing. Estimate $15,000 - $20,000<=>
26. Organize galley drawers $ Need=to know how many drawers, what is in each drawer before pricing<=u>
27. Adjust and strengthen side wal= table hinges $T&M
2
EFTA_R1_01568187
EFTA02461924
Best Regards,
Eric
ERIC H. ROTH<=> I PRESIDENT
=AO please note
The information contained i= this communication is confidential, may be attorney-client privileged,=may constitute
inside information, and is intended only for the use =f the addressee. It is the property of JEE Unauthorized use,
disdos=re or copying of this communication or any part thereof is strictly pro=ibited and may be unlawful. If you have
received this communication =n error, please notify us immediately by return e-mail or by e-mail to =a
href="mailto:[email protected]" target="_blank">jeevacation@gmai=.com, and destroy this communication and
all copies thereof, inc=uding all attachments. copyright -all rights reserved
3
EFTA_R1_01568188
EFTA02461925
ℹ️ Document Details
SHA-256
11f05ffe4b4667a153ab6c1b2c037240a922735c4fc6c76e949ddc6163247135
Bates Number
EFTA02461923
Dataset
DataSet-11
Document Type
document
Pages
3
Comments 0