EFTA01792413
EFTA01792414 DataSet-10
EFTA01792415

EFTA01792414.pdf

DataSet-10 1 page 531 words document
P17 V16 V11 P23 P19
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (531 words)
From: Sent: Saturday, January 15, 2011 9:50 PM To: Jeffrey Epstein Subject: RE: up date Hi Mr.Epstein the house cleaning andnization of all closet areas are g=ing as planed all electronic rubbish was picked up e=cept for some cpu's that wants to clean up. The server room will be =he next on the list when— integrates the server to apple. The ladies =ave been going floor to floor cleaning every inch of the house all closets=included. We left all storage items laid out in the catering kitch=n area on C-level for you to view, to decide what=is garbage , or what can be sold and what can be used in other h=mes. I am also putting a list together with pictures of all all oth=r items that Was requester to be shipped to LS1 . I would like=to have all shipping items picked up this coming week of 1/17/11 i= possible, I have called Oa and we will get pri=ing for shipping when we have a complete list that you approve .1 =ave also been working on a hot water heating problem that I discove=ed when the colder weather came in last week. The heating system upper re =eat Zones being supplied by AC-3 fan & the 5=h floor fan units heating was loosing water pressure effecting room temper=tures on the 4th & 5th floors. After various trouble shooting tests = found the shell & tube Heat exchanger #2 has a tube =eak and the re heat hot water was leaking out water pressure throug= the steam condensate line. This was causing the Re heat h=t water system pressure to drop and the re heat coils to get air b=und on the 5th & 6th floors. I have isolated heat exc=anger #2 until the tube bundle can be replaced ,we are operating off of =eat exchanger#1 with an extra steam bypass supply to make up the d=fferencein capacity all rooms are now making set points. I replaced=Heat exchanger #1 tube bundle about 2 years ago, #2 tube bundle which is=leaking is original to the house .The Source One project is =lso moving forward the full energy report and recommendations for system u= grades will be complete by 1/25/11i am also waiting on Pricing fo= up grades that AD Winston is working on for free coo=ing & removal of the old Carrier Chiller and adding the additional 2= tons of compressors to the new Air stack Chiller. I am als= in the process of setting up meetings with and the various mech=nical maintenance contractors. See you soon Date: Sat, 15 Jan 2011 09:05:09 -0400 Subject: From: jeevacation@g=ail.com To: how s our project coming. The information contained in this communication is confident=al, may be attorney-client privileged, may constitute inside inform=tion, and is intended only for the use of the addressee. It is the pr=perty of Jeffrey Epstein Unauthorized use, disclosure or copying =f this communication or any part thereof is strictly prohibited and =ay be unlawful. If you have received this communication in error, ple=se notify us immediately by return e-mail or by e-mail to [email protected], and destroy thi= communication and all copies thereof, including all attachments. cop=right -all rights reserved EFTA_R1_00123232 EFTA01792414
ℹ️ Document Details
SHA-256
126ff86813906f0644b2fe2c60991aa64c6a7fbcb5ddbc64c8f0fc775b32f52c
Bates Number
EFTA01792414
Dataset
DataSet-10
Document Type
document
Pages
1

Comments 0

Loading comments…
Link copied!