EFTA02456964
EFTA02456967 DataSet-11
EFTA02456971

EFTA02456967.pdf

DataSet-11 4 pages 562 words document
P17 P18 V16 D4 P20
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (562 words)
From: Eric Roth Sent: Tuesday, April 24, 2018 3:16 PM To: effre Cc: Subject: RE: Open item list and estimated pricing Working on scheduling to see if we can=accommodate. As requested and to keep one list cons=lidated, please note the new items 28 (headliner) and 29 (PSU panels) below: Best Regards, Eric ERIC H. ROTH<=> I PRESIDENT www.intljet.=om <http://www.intljet.comk <http://twitter.comMVintljet> <http://www.facebook.com/intljet> 2221S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p> Jeffrey, Many of the items below require your d=finition / confirmation. We have done our best to provide a financia= "feel" for these items. Others are straightforward (airstair steps). EFTA_R1_01560493 EFTA02456967 Furthermore, materials need to be sele=ted for the window line, grospoint for closets, etc... Have a great day! Eric <=pan style="font-size:16.0ptfont-family:"HOK Sans Pro Bold",sa=s-serif;color#A6A6A6">Plan 0, LLC 1. = Lay seat in wood $4,600 - $=,000 2. = Toilet paper cover — =eed to discuss design. $$1,200 - $2,400? 3. = Mirror re-do — $No ch=rge 4. = Aft lay sink drain handle n=eds rubber and tightening $900 - $1,400 5. = Coffee maker area — t=ere is no existing fan in this area 6. = Aft galley kettle steam :=11; $ we do not have a "fix" for removing the steam generated =rom the kettle 7. = Fabricate new lightweight g=lley sink cover - $ No charge 8. = Divan mod to be determined =nd materials $96,700* Does not include R/H mid cabin removal of existing d=van? Create new lower sidewall and ledge? Need design direction / commitment so that we can price compete modificati=n of this center cabin area. 9. = New carpet - $39,800</=:p> 10. Re-veneer fwd side of pocke= door — no peep hole or vacant sign — need definition. C=mplete door? 11. Re-veneer cabin side of aft=lav door cover vacant sign $800 - $1,200 if just a cover plate?=/span> 12. Insulate fwd lay door? Need=to discuss potential design $$1,800 - $2,600? 13. Remove windowline monitors =nd recover $21,360 14. Remove table and lower side=panel "bumpout" at the #3 seat locations $24,300 2 EFTA_R1_01560494 EFTA02456968 15. Fabricate new veneer T.V. c=ver on the L/H forward cabin bulkhead $3,600 16. iPhone charger at the R/H #= ledge like on GIV $3,400 17. Raise arms on co-pilot seat=to match pilot seat, make pilot seat softer and stop pilot seat from shaki=g. $1,600 - $2,100 18. Fabricate leather arm rest =overs for all cabin single seats $4,840 19. Stabilize jump seat $T&= $400 - $1,500? 20. New airstair covers $4,660c=:p> 21. Tighten latches $ T&M &=8211; estimate $800 - $1,400 22. Replace cabin upwash / down=ash lights with new LED lighting $46,700 23. Replace grospoint on three =3) closets, $17,600 24. Remove blow out covers at R=H# 3 & L/H #3 seats $This must stay and are required by Gulfstream 25. Carry on work station $Need= to be designed to identify pricing. Estimate $15,000 - $20,000=/o:p> 26. Organize galley drawers $ N=ed to know how many drawers, what is in each drawer before pricing 27. Adjust and strengthen side =all table hinges $T&M 28. Strip and recove= the entry, fwd lay, main cabin, galley and aft lavatory headliner panels =28,960 29. Strip and recove= the PSU panels throughout the aircraft $26,970 &nbs=; Best Regards, Eric 3 EFTA_R1_01560495 EFTA02456969 ERIC H. ROTH<=> I PRESIDENT www.intljet.=om chttp://www.intljet.comh <http://twitter.comMintljet> chttp://www.facebook.com/intljet> 2221S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p> 4 EFTA_R1_01560496 EFTA02456970
ℹ️ Document Details
SHA-256
12a0efd30fe43b6088a0b568b2c52ef1501a4ee350ed40a0376df6e27616219d
Bates Number
EFTA02456967
Dataset
DataSet-11
Document Type
document
Pages
4

Comments 0

Loading comments…
Link copied!