📄 Extracted Text (562 words)
From: Eric Roth
Sent: Tuesday, April 24, 2018 3:16 PM
To: effre
Cc:
Subject: RE: Open item list and estimated pricing
Working on scheduling to see if we can=accommodate.
As requested and to keep one list cons=lidated, please note the new items 28 (headliner) and 29 (PSU panels) below:
Best Regards,
Eric
ERIC H. ROTH<=> I PRESIDENT
www.intljet.=om
<http://www.intljet.comk <http://twitter.comMVintljet> <http://www.facebook.com/intljet>
2221S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p>
Jeffrey,
Many of the items below require your d=finition / confirmation. We have done our best to provide a financia= "feel" for
these items. Others are straightforward (airstair steps).
EFTA_R1_01560493
EFTA02456967
Furthermore, materials need to be sele=ted for the window line, grospoint for closets, etc...
Have a great day!
Eric
<=pan style="font-size:16.0ptfont-family:"HOK Sans Pro Bold",sa=s-serif;color#A6A6A6">Plan 0, LLC
1. = Lay seat in wood $4,600 - $=,000
2. = Toilet paper cover — =eed to discuss design. $$1,200 - $2,400?
3. = Mirror re-do — $No ch=rge
4. = Aft lay sink drain handle n=eds rubber and tightening $900 - $1,400
5. = Coffee maker area — t=ere is no existing fan in this area
6. = Aft galley kettle steam :=11; $ we do not have a "fix" for removing the steam generated =rom the kettle
7. = Fabricate new lightweight g=lley sink cover - $ No charge
8. = Divan mod to be determined =nd materials $96,700* Does not include R/H mid cabin removal of existing d=van?
Create new lower sidewall and ledge? Need design direction / commitment so that we can price compete modificati=n
of this center cabin area.
9. = New carpet - $39,800</=:p>
10. Re-veneer fwd side of pocke= door — no peep hole or vacant sign — need definition. C=mplete door?
11. Re-veneer cabin side of aft=lav door cover vacant sign $800 - $1,200 if just a cover plate?=/span>
12. Insulate fwd lay door? Need=to discuss potential design $$1,800 - $2,600?
13. Remove windowline monitors =nd recover $21,360
14. Remove table and lower side=panel "bumpout" at the #3 seat locations $24,300
2
EFTA_R1_01560494
EFTA02456968
15. Fabricate new veneer T.V. c=ver on the L/H forward cabin bulkhead $3,600
16. iPhone charger at the R/H #= ledge like on GIV $3,400
17. Raise arms on co-pilot seat=to match pilot seat, make pilot seat softer and stop pilot seat from shaki=g. $1,600 -
$2,100
18. Fabricate leather arm rest =overs for all cabin single seats $4,840
19. Stabilize jump seat $T&= $400 - $1,500?
20. New airstair covers $4,660c=:p>
21. Tighten latches $ T&M &=8211; estimate $800 - $1,400
22. Replace cabin upwash / down=ash lights with new LED lighting $46,700
23. Replace grospoint on three =3) closets, $17,600
24. Remove blow out covers at R=H# 3 & L/H #3 seats $This must stay and are required by Gulfstream
25. Carry on work station $Need= to be designed to identify pricing. Estimate $15,000 - $20,000=/o:p>
26. Organize galley drawers $ N=ed to know how many drawers, what is in each drawer before pricing
27. Adjust and strengthen side =all table hinges $T&M
28. Strip and recove= the entry, fwd lay, main cabin, galley and aft lavatory headliner panels =28,960
29. Strip and recove= the PSU panels throughout the aircraft $26,970
&nbs=;
Best Regards,
Eric
3
EFTA_R1_01560495
EFTA02456969
ERIC H. ROTH<=> I PRESIDENT
www.intljet.=om
chttp://www.intljet.comh <http://twitter.comMintljet> chttp://www.facebook.com/intljet>
2221S=ithtown Avenue, Long Island MacArthur Airport, Ronkonkoma, New York 11779<=:p>
4
EFTA_R1_01560496
EFTA02456970
ℹ️ Document Details
SHA-256
12a0efd30fe43b6088a0b568b2c52ef1501a4ee350ed40a0376df6e27616219d
Bates Number
EFTA02456967
Dataset
DataSet-11
Document Type
document
Pages
4
Comments 0