EFTA02488297.pdf
👁 1
💬 0
📄 Extracted Text (281 words)
From: jeffrey E. <[email protected]>
Sent: Friday, September 4, 2015 4:21 PM
To: Cecile de Jongh
Subject: Re: Work in Office
Yes
On Friday, September 4, 2015, Cecile de Jongh «=
href= w=ote:
The guys are done with the wall= and the ceilings in the two offices and they are ready to paint. Th= estimate
did not include painting. The quote to paint both offices is $750. We have an additional bill of $1,410 for the work done
in the kitchen (lowering the ceiling level and repla=ing the tiles with green board to absorb moisture). Please let me
know whe=her we can go ahead and have them paint and pay them for the labor and mat=rials for the kitchen. The
total for the painting and the kitchen wo=k is $2,160.
$1,750 =A0to replace the 376 sq ft of ceiling tiles in the hallway leading from th= kitchen to your office. He
would replace the tiles with the gr=en board to also absorb the moisture and also match the tiles in the offic=s and the
kitchen. Let me know if you want to proceed with this part=
With warm regards,
Cecile
please no=e
The information contained in this communication is confidenti=l, may be attorney-client privileged, may constitute
inside information= and is intended only for the use of the addressee. It is the property =f JEE Unauthorized use,
disclosure or copying of this communicati=n or any part thereof is strictly prohibited and may be unlawful. If yo= have
received this communication in error, please notify us immediatel= by return e-mail or by e-mail to
[email protected] <mailto:[email protected]=m> , and destroy this commun=cation and all copies thereof,
including all attachments. copyright -al= rights reserved
EFTA_R1_01608252
EFTA02488297
ℹ️ Document Details
SHA-256
13da4706fd6b8ad8ce55806588e45c94459b71641548f7c2610ff86f93689428
Bates Number
EFTA02488297
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0