EFTA02614340.pdf
👁 1
💬 0
📄 Extracted Text (73 words)
From: Kyle reavis <
Sent: Monday, November 26, 2018 6:19 PM
To: jeffrey E.
Cc: brice gordon; Richard Kahn; LSJ Michael Glidden
Subject: Barge Ramp Heavy Materials Concrete
Good Afternoon,
After letting EB know a=out the open slots with HM we have got them on the schedule for this Frida= at 730 am to pour
the ramp. This will be a 17 yard pour so two truc=s.
Very Respectfully,
Ky=e
1
EFTA_R1_01812603
EFTA02614340
ℹ️ Document Details
SHA-256
147e3141f582f45a21ca69804ed801a87a1354470f3f02d4121caa82dc06e161
Bates Number
EFTA02614340
Dataset
DataSet-11
Type
document
Pages
1
💬 Comments 0