📄 Extracted Text (186 words)
From: Larry Visoski
To: Je vacation <jeevacation®gmail.com>
Cc: Rich Kahn Lany <I.a>
Subject: GIV 72Month inspection invoice
Date: The, 17 Jul 2018 13:54:29 +0000
Attachments: SC18654 PRELIM 06-28-18.pdf
Jeffrey
For your approval,.
Total Owed at this time for 72month inspection at Westfield:
$233,993.15
Do you approve this invoice for funding?
Thank you,
Larry
BreakDown of the 117 page invoice attached:
Inspection quoted flat rate:
72 Month flight control $47,760.00
72 Month Due cards $44,944.00
Antenna Corrosion Inspection $19,500.00
Total inspection Flat rated quote—Total $112,204.00
High dollar items repaired:
1-EPMP Electrical overhead panel Cockpit- $42,342.10
2-TCAS system failure $13,334.39
3-RJH inboard Flight Spoiler Corrosion--$26,310.87
4-Heavy corrosion Landing gear $ 3,614.91
5-Elevator trim tab corrosion $ 4,105.24
6-New InBoard Ground spoiler ($26,310.87).no Charge
7-Elevator out of balance, paint thickness- $6,824.71
8-Misc Shop supplies $5,000.00
9-TCAS upper doubler antenna interface—$3,406.85
10-TCAS Lower double removal Paint thick -$3,426.05
Total High dollar items $108,365.12
Remaining charges are $5000 or less contained on the 117 pages of repair items listed on invoice: Total
$69,563.53
$112,204.00 quoted
$108,365.12 repairs
$ 69,563.53 misc charges
$290,132.65 total 72 month inspection
Sent from my iPad
EFTA01005623
ℹ️ Document Details
SHA-256
14b0316a9bdb3ae928deb4a3d0291befffad4379eac012086781be5499341c51
Bates Number
EFTA01005623
Dataset
DataSet-9
Document Type
document
Pages
1