📄 Extracted Text (502 words)
STATE OF
rri
Date: 9; 29/2015 Estimate #: 8146
Proposal
az. 128 East 32nd Street
re" New York, NY 10016
Office: (212)447 1718
Fax: (212) 447 8510
GALLERY www.sotafloors.com
Client / Address Project Location:
Karyna Shuliak
Description Tota
Project: Wood Floor Sanding and Refinishing 4,666.75T
Areas: Throughout Residence - Excluding Closets.
- Machine and hand sand wood flooring to a fine finish.
Apply 1 Coat Stain to achieve desired color.
Apply 3 Coats High Quality Waterborne Finish.
Floor to be abraded between coats for maximum adhesion and durability.
*All Furniture, fixtures and personal belongings to be removed by others prior
to our arrival.
EXCLUSIONS: 0.00T
All pricing is valid for 30 days.
All work to be completed will be non-union labor unless specified otherwise in
the descriptions listed above
Environment conditions are to be stable and remain within National Wood
Flooring Association standards (65 — 75 degrees Fahrenheit & 35 — 50% relative
humidity)
All pricing is taxable unless the client provides State of the Art Wood Floor
Gallery, Corp. a valid NYS Sales Tax Exemption Certificate (Capital
Improvement / Resale Certificate) prior to job start.
Sub-floor is to be level and clean and free and clear of all fixtures, obstructions
and other trades.
Truly yours, Subtotal
Sales Tax (8.875%)
Eric Herman
Total
Eric Herman
President
State of the Art Wood Floor Gallery Inc. Approved by:
Page 1
EFTA_R1_02143602
EFTA02714950
STATE OF
rin
Date: 9.29/2015 Estimate #: 8146
Proposal
3:a 128 East 32nd Street
re" New York, NY 10016
Office: (212)447 1718
Fax: (212) 447 8510
GALLERY www.sotafloors.com
Client / Address Project Location:
Karyna Shuliak
Description Tota
No patching, leveling, concrete grinding or major surface preparation is
included in the contract unless specified in the descriptions above.
No furniture moving is included unless specified in the descriptions above.
No demolition is included unless specified in the descriptions above.
All flooring will be installed as per manufacturers recommended application.
No metal, wood or stone saddles are included unless specified in descriptions
above.
All work is to be done during normal business hours unless noted above.
Any unforeseen structural issues made apparent throughout the course of work
will be handled as they occur.
Baseboards, moldings and walls may require touch-ups to be done by others.
Do not put tape on a newly finished floor as it may remove the coatings.
All changes to a project are to be discussed with an officer of the State of the
Art, not any field workers.
State of the Art Wood Floor Gallery, Corp. does not accept credit cards. If the
client must pay with a credit card we reserve the right to add all necessary
processing fees to the above pricing.
All terms are to be agreed upon prior to job start.
By signing the quotation you, the client, approve and agree to exclusions and
terms set forth.
Truly yours, Subtotal $4,666.75
Sales Tax (8.875%) $414.17
Eric Herman
Total $5,080.92
Eric Hennan
President
State of the Art Wood Floor Gallery Inc. Approved by:
Page 2
EFTA_R1_02143603
EFTA02714951
ℹ️ Document Details
SHA-256
14c10939a3d0d32d98b1ee50eca4deb480354cbb5412492a2912d828589e3969
Bates Number
EFTA02714950
Dataset
DataSet-11
Document Type
document
Pages
2
Comments 0