EFTA02714948
EFTA02714950 DataSet-11
EFTA02714952

EFTA02714950.pdf

DataSet-11 2 pages 502 words document
P17 V11 V16 P23 D4
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (502 words)
STATE OF rri Date: 9; 29/2015 Estimate #: 8146 Proposal az. 128 East 32nd Street re" New York, NY 10016 Office: (212)447 1718 Fax: (212) 447 8510 GALLERY www.sotafloors.com Client / Address Project Location: Karyna Shuliak Description Tota Project: Wood Floor Sanding and Refinishing 4,666.75T Areas: Throughout Residence - Excluding Closets. - Machine and hand sand wood flooring to a fine finish. Apply 1 Coat Stain to achieve desired color. Apply 3 Coats High Quality Waterborne Finish. Floor to be abraded between coats for maximum adhesion and durability. *All Furniture, fixtures and personal belongings to be removed by others prior to our arrival. EXCLUSIONS: 0.00T All pricing is valid for 30 days. All work to be completed will be non-union labor unless specified otherwise in the descriptions listed above Environment conditions are to be stable and remain within National Wood Flooring Association standards (65 — 75 degrees Fahrenheit & 35 — 50% relative humidity) All pricing is taxable unless the client provides State of the Art Wood Floor Gallery, Corp. a valid NYS Sales Tax Exemption Certificate (Capital Improvement / Resale Certificate) prior to job start. Sub-floor is to be level and clean and free and clear of all fixtures, obstructions and other trades. Truly yours, Subtotal Sales Tax (8.875%) Eric Herman Total Eric Herman President State of the Art Wood Floor Gallery Inc. Approved by: Page 1 EFTA_R1_02143602 EFTA02714950 STATE OF rin Date: 9.29/2015 Estimate #: 8146 Proposal 3:a 128 East 32nd Street re" New York, NY 10016 Office: (212)447 1718 Fax: (212) 447 8510 GALLERY www.sotafloors.com Client / Address Project Location: Karyna Shuliak Description Tota No patching, leveling, concrete grinding or major surface preparation is included in the contract unless specified in the descriptions above. No furniture moving is included unless specified in the descriptions above. No demolition is included unless specified in the descriptions above. All flooring will be installed as per manufacturers recommended application. No metal, wood or stone saddles are included unless specified in descriptions above. All work is to be done during normal business hours unless noted above. Any unforeseen structural issues made apparent throughout the course of work will be handled as they occur. Baseboards, moldings and walls may require touch-ups to be done by others. Do not put tape on a newly finished floor as it may remove the coatings. All changes to a project are to be discussed with an officer of the State of the Art, not any field workers. State of the Art Wood Floor Gallery, Corp. does not accept credit cards. If the client must pay with a credit card we reserve the right to add all necessary processing fees to the above pricing. All terms are to be agreed upon prior to job start. By signing the quotation you, the client, approve and agree to exclusions and terms set forth. Truly yours, Subtotal $4,666.75 Sales Tax (8.875%) $414.17 Eric Herman Total $5,080.92 Eric Hennan President State of the Art Wood Floor Gallery Inc. Approved by: Page 2 EFTA_R1_02143603 EFTA02714951
ℹ️ Document Details
SHA-256
14c10939a3d0d32d98b1ee50eca4deb480354cbb5412492a2912d828589e3969
Bates Number
EFTA02714950
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!