👁 1
💬 0
📄 Extracted Text (272 words)
To:
Cc: Jeffrey Epstein(jeevacation©gmail.comj; Brice Gordo
From: Richard Bamett
Sent Mon 5/13/2013 8:05:29 PM
Subject: RE: Zorro Exhause Fan
Rich Kahn on the Friday May 3rd conference call with Brice Gordon in order to move forward
we discussed having the engineering company Beaudin Ganze look at the pool room engineering
at Zorro and check the air balance of the pool room pool pack system .We also discussed in
order to install a Exhaust fan system in the pool area we need to know what the pool pack unit is
putting out with CFM of air flow and we also discussed there is an existing problem with the air
flow above the room in the duct work that feeds the upper diffusers above the pool causing the
pool pack to not function properly. You said you reviewed the proposal from B&G and did not
like the way the proposal was written by the engineer .Brice said he would have the engineer re
write and the proposal and re send to you for approval An May 8th I received the re written
B&G proposal from Brice Gordon and it was also addressed to you .In order to move forward
with the installation of the Exhaust system we need the engineering Proposal approved so we
can have the proper equipment specified for the installation . Thanks Richard Barnett
From:
Subject: Zorro Exhause Fan
Date: Mon, 13 May 2013 12:17:57 -0400
To:
Jeffrey would like and update on you are on having this installed..
Please advise
Richard Kahn
HBRK Associates Inc.
575 Lexington Avenue, 4th Floor,
New York, New York 10022
tel
fax
cell
EFTA_R1_00452861
EFTA01970667
ℹ️ Document Details
SHA-256
150591e5120df9d2089d980ecbac85e325964e8c17d85ec528da58e202568ead
Bates Number
EFTA01970667
Dataset
DataSet-10
Type
document
Pages
1
💬 Comments 0