EFTA02409027
EFTA02409028 DataSet-11
EFTA02409031

EFTA02409028.pdf

DataSet-11 3 pages 208 words document
P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (208 words)
To: Jeevacation eevacation@gmaitcomi From: Sent Sun 11/21/2010 2:43:12 AM Subject: Gary Kemey's To Do List Jeffrey's To Do List Date Updated Nov. 19,2010 Name: Gary LSJ Library Outstanding Issues: I .Ceiling Treatment: Ion working 2. Cabinet finishes 3. Floor finishes — open issue Master Suite: Status Interior I. Thassos starting 9/20 takes 2 months(11/20) 2. Wood floors 11/20 to 12/20 3. Occupy 1/20 Outstanding Issues I.out side shower will mock up for next visit 2.1ites over bed Doug EFTA_R1_01469001 EFTA02409028 3.1ighting in bedroom EDoug Kitchen: Wall finish? Complete 2/28/11 Laundry: 1.complete 1211 Cottages: NVall refinished for Ion 11/25/10 Marble vanities 11/25/10 Outstanding Issues: 1.Shower Design Doug Mechanical Electrical: Status under way should complete by Mechanical Dcsal: Status under way should complete by Nov 30 POOL/THEATER Leff planning POP'S GARDEN I.underway Dock House/Floating Dock /.plans being submitted 9/15 Hanger EFTA_R1_01469002 EFTA02409029 Have been in contact with the Butler building rep. for the carrib on hold pending approval Ca14/1 Status submitting by July 1 1.Plans go in the 6/30being reviewed 2.Assume approval by September 30 3.Construction plans by November 31 4.Permits by January 30 5.Pool by June 30 6.Cottage by August 31 7.Music room by June 30 8. Tennis by April 30 I.Dejonge will have plan by 9/1/10 EFTA_R1_01469003 EFTA02409030
ℹ️ Document Details
SHA-256
16518f882dcb6cce90ce2cc0cff4439ebc14e70a6e2b0450c37507290270a828
Bates Number
EFTA02409028
Dataset
DataSet-11
Document Type
document
Pages
3

Comments 0

Loading comments…
Link copied!