EFTA02608965
EFTA02608966 DataSet-11
EFTA02608971

EFTA02608966.pdf

DataSet-11 5 pages 651 words document
P17 V16 P23 V12
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (651 words)
From: Ann Rodriquez Sent: Friday, December 21, 2018 1:26 PM To: brice gordon Cc: LSJ GSJ; Cecile de Jongh; LSJ Kyle Reavis; Elderfield Roberts Subject: Re: LSJE_KENNY_VISIT_121818 Hi all, Morning, l=will be installing on Saturday on Lsg,. I will be taking measurem=nts for Cabana, 2,3,&4 on Saturday. Yes, all piec=s for Cabana 1 will be installed on Saturday. The tops are 1=5" (4cm, 2 - .75" laminated together) The thickness in tota= is 1.5" & not sure of overhang. Sent from my iPhone On Dec 20, 2018= at 8:18 PM, brice gordon wrote: Thank you =ent from my iPhone On Dec 20, 2018, at 5:17 PM, A=n Rodriquez wrote: wi=l do Sent from my i=hone On Dec 20, 2018, at 7:59 PM, brice gordon <mailto wro=e: Good Evening regards=Brice EFTA_R1_01802504 EFTA02608966 Hi all, <=iv> Ken said that he wil= need a Barge run Saturday morning... Cabana 1 will be 100% completed on Saturday<=span> </=pan> Cabana 2= 3 & 4 will all have the long countertops but not the vanity sink becau=e the Cabinet base was not installed for measurements to be taken. Ken will take those=measurements on Saturday Flagpole pool kitchen is cut and ready to be instal=ed. <imagetjpeg><image2.jpe=><image3.jpeg><image4.jpeg><Image5.jpeg><image6.jpe=><image7.jpeg><image8.j peg><image9.jpeg><image10.jp=g> Sent from m= iPhone On Dec 20, 2018, at 11:35 AM, Ann Rodriqu=z <mailto rote: I just spoke to Ken. He have the blade and he =99s headed to his shop. I'll meet him there <imagel.png> rote: Hi <=iv dir="ltr">Cabanas are top priority this includes countertops and vanit= tops One of each for the 4 Cabanas - 2 section= each cabana He also has the kitchen at the Fla=pole Pool On Dec 19, 2018, at 10:00 AM, Ann Rodri=uez rote: cma"tc v Hi 2 EFTA_R1_01802505 EFTA02608967 I will go back to Ken and ask about t=e vanity tops. I can better assist if I'm aware of all the pieces a= his shop? I'm only aware of the Cabana =80 s Please advise, Ann=R. Sent fr=m my iPhone On Dec 19, 2018, at 9:27 AM, LSJ GSJ <mailt( > wrote: Hi Thank you, so vanity tops will not be ready only long countert=ps? On Dec 19, 2018, at 9:23 AM, Ann Rodriquez &I <mailt rote: Hi all, Ken said the countertops wil= be ready for Saturday. I will stay on top of him until Saturday <imagel.jpeg> <image2.jpeg> Sent fro= my iPhone On Dec 18, 2018, at 7:07 PM, Cecile de=Jongh <mailto wrote: Ok. W=th warm regards, =ecile Sent from my iPhone and misspellings c=urtesy of iPhone. On Dec 18, 2018, at 5:43 P=, LSJ GSJ <mailto: wrote: 3 EFTA_R1_01802506 EFTA02608968 Ok, thanks for the update. On Tue, Dec 18, 2018 at 5:07 PM Ann Rodr=quez <mailto rote: I =80 m just leaving Ken's shop. No answer & No show and his sho= is still open. East end lumber said that I have to leave because=they have to close both gates at 5pm. I will be the=e at 8am tomorrow morning. He's literally 2min away Sent fr=m my iPhone On Dec 18, 2018, at 4:48 PM, LSJ GSJ <mailt wrote: On Tue, Dec 18, 2018 at 4:35 PM Ann Rodriquez=< <mailto wrote: I'm sitting at Ken =80 s shop right now awaiting his arrival Sent from my iPhone > On Dec 18, 2018, at 4:21 PM, LSJ GSJ <mailto w=ote: > Good Day Anna > JE has requested that you go to Kenny's (Granite/Counter Fabricater) sh=p to find out status of work. Please advise when you will be going > Thank you > Warmest regards > -- > The St. James Group > 6100 Red Hook Quarter > Suite 83 > St Thomas > USVI 00802 4 EFTA_R1_01802507 EFTA02608969 <=iv> The St. James Group 6100 Red Hook Quarter Suite B3 St Thomas USVI 00802 <=iv dir="Itr"> The St. James Group 6100 Red Ho=k Quarter Suite B3 St Thomas USVI 00802 <=div> </=lockquote> Brice Gordon The Saint James Group USVI Ph 5 EFTA_R1_01802508 EFTA02608970
ℹ️ Document Details
SHA-256
1730ebe59fabccaa68ca9c00abd95d8202a5a37841322646752fbec9d4d0607d
Bates Number
EFTA02608966
Dataset
DataSet-11
Document Type
document
Pages
5

Comments 0

Loading comments…
Link copied!