From: Ann Rodriquez
Sent: Friday, December 21, 2018 1:26 PM
To: brice gordon
Cc: LSJ GSJ; Cecile de Jongh; LSJ Kyle Reavis; Elderfield Roberts
Subject: Re: LSJE_KENNY_VISIT_121818
Hi all,
Morning, l=will be installing on Saturday on Lsg,.
I will be taking measurem=nts for Cabana, 2,3,&4 on Saturday.
Yes, all piec=s for Cabana 1 will be installed on Saturday.
The tops are 1=5" (4cm, 2 - .75" laminated together) The thickness in tota= is 1.5" & not sure of overhang.
Sent from my iPhone
On Dec 20, 2018= at 8:18 PM, brice gordon wrote:
Thank you
=ent from my iPhone
On Dec 20, 2018, at 5:17 PM, A=n Rodriquez
wrote:
wi=l do
Sent from my i=hone
On Dec 20, 2018, at 7:59 PM, brice gordon
<mailto wro=e:
Good Evening
regards=Brice
EFTA_R1_01802504
EFTA02608966
Hi all,
<=iv>
Ken said that he wil= need a Barge run Saturday morning...
Cabana 1 will be 100% completed on Saturday<=span>
</=pan>
Cabana 2= 3 & 4 will all have the long countertops but not the vanity sink becau=e the Cabinet
base was not installed for measurements to be taken. Ken will take those=measurements on Saturday
Flagpole pool kitchen is cut and ready to be instal=ed.
<imagetjpeg><image2.jpe=><image3.jpeg><image4.jpeg><Image5.jpeg><image6.jpe=><image7.jpeg><image8.j
peg><image9.jpeg><image10.jp=g>
Sent from m= iPhone
On Dec 20, 2018, at 11:35 AM, Ann Rodriqu=z
<mailto rote:
I just spoke to Ken.
He have the blade and he =99s headed to his shop. I'll meet him there
<imagel.png>
rote:
Hi
<=iv dir="ltr">Cabanas are top priority this includes countertops and vanit= tops
One of each for the 4 Cabanas - 2 section= each cabana
He also has the kitchen at the Fla=pole Pool
On Dec 19, 2018, at 10:00 AM, Ann Rodri=uez
rote:
cma"tc v
Hi
2
EFTA_R1_01802505
EFTA02608967
I will go back to Ken and ask about t=e vanity tops. I can better assist if I'm
aware of all the pieces a= his shop?
I'm only aware of the Cabana =80 s
Please advise,
Ann=R.
Sent fr=m my iPhone
On Dec 19, 2018, at 9:27 AM, LSJ GSJ
<mailt( > wrote:
Hi
Thank you, so vanity tops will not be ready only long countert=ps?
On Dec 19, 2018, at 9:23 AM, Ann Rodriquez &I
<mailt rote:
Hi all,
Ken said the countertops wil= be ready for Saturday. I will stay on top of him
until Saturday
<imagel.jpeg>
<image2.jpeg>
Sent fro= my iPhone
On Dec 18, 2018, at 7:07 PM, Cecile de=Jongh
<mailto wrote:
Ok.
W=th warm regards,
=ecile
Sent from my iPhone and misspellings c=urtesy of iPhone.
On Dec 18, 2018, at 5:43 P=, LSJ GSJ
<mailto: wrote:
3
EFTA_R1_01802506
EFTA02608968
Ok, thanks for the update.
On Tue, Dec 18, 2018 at 5:07 PM Ann Rodr=quez
<mailto rote:
I =80 m just leaving Ken's shop. No answer & No show and his sho= is still open.
East end lumber said that I have to leave because=they have to close both gates
at 5pm.
I will be the=e at 8am tomorrow morning. He's literally 2min away
Sent fr=m my iPhone
On Dec 18, 2018, at 4:48 PM, LSJ GSJ
<mailt wrote:
On Tue, Dec 18, 2018 at 4:35 PM Ann Rodriquez=<
<mailto wrote:
I'm sitting at Ken =80 s shop right now awaiting his arrival
Sent from my iPhone
> On Dec 18, 2018, at 4:21 PM, LSJ GSJ
<mailto w=ote:
> Good Day Anna
> JE has requested that you go to Kenny's (Granite/Counter Fabricater) sh=p to
find out status of work. Please advise when you will be going
> Thank you
> Warmest regards
> --
> The St. James Group
> 6100 Red Hook Quarter
> Suite 83
> St Thomas
> USVI 00802
4
EFTA_R1_01802507
EFTA02608969
<=iv>
The St. James Group
6100 Red Hook Quarter
Suite B3
St Thomas
USVI 00802
<=iv dir="Itr">
The St. James Group
6100 Red Ho=k Quarter
Suite B3
St Thomas
USVI 00802
<=div>
</=lockquote>
Brice Gordon
The Saint James Group
USVI
Ph
5
EFTA_R1_01802508
EFTA02608970
ℹ️ Document Details
SHA-256
1730ebe59fabccaa68ca9c00abd95d8202a5a37841322646752fbec9d4d0607d
Bates Number
EFTA02608966
Dataset
DataSet-11
Document Type
document
Pages
5
Comments 0