📄 Extracted Text (919 words)
To: Warwick Wicksman Jeffre
[email protected]]: gary kerney ( gary kerney
From: Tom Sze
Sent: Thur 12/23/2010 12:52:12 AM
Subject: RE: LSJ Plan Studies and Happy Holidays!
Jeffrey and Gary,
Shall I go ahead and plan on flying out the week of Jan 10th and meet with you?
I can arrive late Tuesday 1/11 and work all day Wednesday 1/12 and fly out
Thursday.
If that works, I will plan accordingly.
Tom
Tom Sze, AIA
Senior Associate
Direct
Main
Mobile
Gensler
2500 Broadway
Suite 300
Santa Monica California 90404
USA
From: Warwick Wicksman
Sent: Wednesday, December 22, 2010 4:15 PM
To: Jeffrey Epstein; Gary Kerney ([email protected])
Cc: Tom Sze
Subject: RE: LSJ Plan Studies and Happy Holidays!
Thanks. Gary, please send us the comments. Then we can set up a time for Tom to call
Jeffrey.
Thanks,
Warwick
EFTA_R1_00206915
EFTA01830564
Warwick Wicksman, AIA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica. California 90404
USA
Click here to view Gensler's 2010 Annual Reoort,
From: Jeffrey Epstein [mailto:[email protected]]
Sent: Wednesday, December 22, 2010 4:12 PM
To: Warwick Wicksman
Subject: Re: LSJ Plan Studies and Happy Holidays!
i have given and sent comments.. gary please follow up. torn should call me to reivew„ the 10th
is better.
On Wed, Dec 22, 2010 at 7:38 PM, Warwick Wicksman
wrote:
Jeffrey. Gary and Doug.
Just a quick note to wish you "Happy Holidays". I hope you each get to spend some time with family and friends,
relaxing, and reflecting back on some of the better things from this past year. Our office is closed Thursday and
Friday of this week and next week. I will also be on vacation next week (between Christmas and New Years). and
part of the following week. Toni is continuing to work on the plan options during this time.
I have attached the latest sketches for the main residence pool and living room.
• We would like your comments on the three plan studies for the living room level, sent out earlier this week
(Options A, B & C).
• We prepared preliminary layouts for the pool level and the intermediate balcony, with the larger column
spacing. We also moved the stair from the balcony down to the pool. These would be adjusted slightly depending
on which upper level plan we go with.
We are now working on some sections to study overall heights. As soon as we have a direction on the upper level,
we will prepare some 3D model views.
EFTA_R1_00208916
EFTA01830565
Also, please let me know if the week of the 1016 will work for Tom to come to the Island, or if it can wait until the
week of the 17i°.
Thanks,
Warwick
Warwick Wicksman, AIA
Sim
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
Click here 10 view Gensler's 2010 Annual Report.
From: Warwick Wicksman
Sent: Monday, December 20, 2010 12:02 PM
To: jeevacation(itamail,com; 'Doug Schocttle'; RMOI
Cr: Toni Sze: Bryan Oakes
Subject: LSJ Plan Studies - Main Residence
Jeffrey.
Attached are three plan variations that address what we discussed last week.
Option A:
• This plan is similar to what we discussed, and your faxed sketch.
• We shifted the support building to be centered with the new living room
• We opened up the walkway leading from the main residence to the new spaces.
• We arc concerned about the overall size of the new living room with the added enclosed gallery space: it's
about 50' x 40'!
• This plan may also require us to shift a portion of the roadway, but I do not think we have room at that area. I
think the drop off on the north side of the road is pretty steep.
EFTA_R1_00206917
EFTA01830566
Option B:
• This combines the support spaces and living room into one building, and re-aligns them similar to what we
discussed.
• This building also feels very large; it's about 70' x 30'
• We also kept the small building north of the office, but it could be omitted, and the courtyard expanded.
Option C:
• This scheme seems to be the most efficient for overall building massing.
• We would expand the existing office, and create bathrooms, crafts, support, etc.
• The living room would stand on its own, t 30' x 50'.
• We may create a larger veranda on the west side of the living room.
• We do need to address the much larger deck on the east. This is the roof over the pool area. We do not think
it should all be deck; perhaps a small part sheltered deck with "lookout" area (like the opposite side of the garden),
and the rest landscape or roof over the pool below.
Please let me know your thoughts. We are working on the lower level plan diagrams for the pool and balcony.
Thanks,
Warwick
Warwick Wicksman, AlA
Principal
Gensler
2500 Broadway
Suite 300
Santa Monica, California 90404
USA
Click here to view Gensler's 2010 Annual Reams
EFTA_R1_00206918
EFTA01830567
The information contained in this communication is
confidential, may be attorney-client privileged, may
constitute inside information, and is intended only for
the use of the addressee. It is the property of
Jeffrey Epstein
Unauthorized use, disclosure or copying of this
communication or any part thereof is strictly prohibited
and may be unlawful. If you have received this
communication in error, please notify us immediately by
return e-mail or by e-mail to [email protected], and
destroy this communication and all copies thereof,
including all attachments. copyright -all rights reserved
EFTA_R1_00206919
EFTA01830568
ℹ️ Document Details
SHA-256
17df11440d293f00c146f1161e27e7340de8322e3a831da01e38415b9c102a23
Bates Number
EFTA01830564
Dataset
DataSet-10
Document Type
document
Pages
5
Comments 0