EFTA01139445.pdf

DataSet-9 6 pages 2,516 words document
👁 1 💬 0
📄 Extracted Text (2,516 words)
From: Cecile dc Jongh To: Jeffrey Epstein ,:jeevacation(a)gmail.com> Subject: Fw: fiher project Date: Tue. OR Dec 2015 IR:00:17 +0000 Inline-Images: image001.jpg: imagc002.png With warm regards. Cecile On Friday. December 4.2015 5:59 PM. Hector Cintmo •: :• wrote: Hi Everyone: Eli send a full detail report in a few days. So far here is a brief description. • The Ruckus AP that is setup to cover the southside of the island that is installed on the tower where the Dragonwave is not working. • There was a network loop between the dragonwave and the netgear causing packet drops and unstable network. " Fixed • Install two switches (Outside shelter. Gym) to be able to monitor both the Dragonwave and Ruckus bridge • Took out the apple router that was working as DHCP and NAT. • Brought the Cisco 2921 router online. Now this is the main DHCP and NAT router • Installed the fiber cable and module for the ViNGN connection. This was installed in Port 5 on the fryer cable that goes to Vessum • I re-enable the dragonwave management ports so I can verify the configuration • I changed the password of both radios (the default password was configured Jermaine DI get you the new password so you can file them) • I added some of basic monitoring. For the dragonwave (I would be able to add full monitoring until I reconfigure the units) • I added monitoring to the cisco router and the switch in the shelter We did some testing before we left with youtube and AppleTV and all were working without buffering. The Dragonwave wit have to be taken offline once the ViNGN circuit goes online. The software on the unit is old and it has some bugs that wil cause issues once the units are up for about 1-2 months. The connection will drop until the unit is rebooted. Another bug is this error. Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn cleared Notice:Dec 01 21:55:01 C1N14DGM0075 alarm[544789-11: Critical: Crypto configuration mismatch peer /Morn raised MAIllettlfig laying) hey nulrrldfur to proper Key. 1957 Crypto configuration mismatch alarm raised on new link or radio I 1.01.00 I 1.02.05 swap even if encryption is not enabled on both radios. 170 !nowt. ennfinnratL-w• enicantrh elerme nnt eta arael Agana reran 1 Al NI 1 Al AC Will send the rest of the info in the detail report From: Jemmme Ruan (mailto Sent: Friday. December 04 21.1 To: Omar Welch. Hector Cintron Cc: Subject: Fwd: fiber project Email received from outside of the ATN domain. Lisa caution before using imksrattachments. Good day all. Hector was able to complete the (Glowing: - clear up the network loop that was causing bottle in data follow - install the switches to monitor the dragonwaves - physical setup for the new router for vingn To be done: -Wrign to do the physical acesover at stt -create the tier login id's for dragchwaves -setup for remote monitoring for island Regards -Oman Sent from my Phone Begin forwarded message: From: Hector Cintrch Date: Decanter 3.2015 at 7:19:30 PM MT To: Jermame Rh Cc: Omar Welch eo ei°^9h ' •AlYsfer Edwards Subject: RE: fiber project When I left the office I asked Allan and I didn't see the cables. he will be looking into it. Also just an FYI I logged in the dragonwave to gather some information and I noticed that both Ethernet ports (data and management) on the LSJ side are plugged in to the switch creating a network loop . What I did was shutdown the management port on outside. This will help some but will be fixed tomorrow. I would not be surprised that accessing the internal is smoother now due to EFTA01139445 lowering of the packet drops and max times Pings before shuting down the port Success rate is 98 percent (9876110000). round-trip min/an/max = 1(41128 ms After Success rate is 99 percent (9999110000). round-trip min/an/max = 1(4144 ms From: Jermaine Ruan jm81803.1.1 Sent: Thursday. December 0 . To: Hector Contron Cc: Omar Welch: Cede de Jongh: Alyster Edwards Subject Re: fiber project Email receNed from outside of the ATN amain. Use cauticn before using Mks/attachments. HI Hector Terrence stated that the login for dragonwaves we set to factory default . Regards Jruan Sent from my iPhone On Dec 3. 2015. at 3:52 PM. Hector Ontron Hi Jermaine. I just spoke with omar and the cable hasn't arrived. what we can do is this. Ill split the work on two trips. go tomorrow weather permitting (it's supposed to be sunny) regardless if the VINGN circuit is ready and do the installation. I'll bring up the router and install the 2 switches to be able to monitor the dragonwave and I'll leave the deep inspection and testing for the second trip once VINGN is up. There will be a downtime of between 1 to 2 hours as I make the changes. If this is acceptable I'm a GO for tomorrow. What I'll need after the switch installation is the logins for the dragonwave so once this is done I can start with the verification of the link (no changes will be made). On the second trip I'll go to the island with Alyster takedown the dragonwave to do the following: Test ViNGN circuit Test ViNGN failover Verify all grounding Verify all connectors weatherproofing Verify Lightning arrestors Check all cables and replace cables if needed Upgrade firmware on DW if needed Make configuration changes to the DW if needed Let me know if this is acceptable. From: Jermaine Sent: Wednesday. 0 To: Omar Welch Cc: 'Cecile de Jonah': Alyster Edwards: Hector Canton Subject: RE: fiber project Email received from outside of the ATN domain. Use caution before uang links/attachments. Good Evening Omar. I am following up to verify that VINGN is on target for tomorrow and Choice for Friday. Regards Jruan From: Hector Cintron jrnaJ1111.11M Sent: Monday. November 30. To: Jemmine Ruan Cc: Cecile de Jongh: Omar Welch: /Water Edwards Subject: RE: fiber project Perfect. you got everything. The PDF only had the fiber from Power and Tel and not the items from curvature. so I just wanted to make sure. Thanks From: Jermaine Ruan jrasklgill Sent: Monday. November 30. To: Hector Gnaw Cc: Cecile de Jongh: Omar Welch: Alyster Edwards Subject: Re: flier project Email received from outside of the ATN domain. Use caution before uang links/attachments. Good day Hector EFTA01139446 I have 2 simplex and 3 duplex cables from power and tel. I have 1 hwic module and 1 glc connector. Lo5mage1.JPG Sent from my &bone On Nov 30. 2015. at 4:31 PM. Hector Cintron wrote: Those are the fiber cable from power and tel. was an order placed for the cutvature items? Bellow I highlighted the items: Green are the items from Power and Tel that arrived Yellow are the items from Culvature that I do not see listed on the PDF From: Jermaine mailto Sent Monday. November 30.2015 16:24 To: Hector Cintron: 'Cecile de Jongh' Cc: Omar Welch: Alyater Edwards Subject RE: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Please see attached From: Hector Caton [ma Sent Monday. November 30.201512:54 PM To: Cede de Jongh Cc: Omar Welch: Jenaaine:Alyster Edwards Subject RE: fiber project Jermaine. Can you send me a list of all the items that you received? I want to make sure we have everything. I just created a BOM to keep track of what is needed and I'm sure I'll adding to the work/pending list BOM OTY part desc Installed Location arrived Responsibility 1 CISCO2921/K9 Cisco Router Data Room Installed Choice 1 GLC-BX-D ViNGN Simplex Single Mode Module In the data router Data Room LSJ 1 LinG14- Siinf)lex Cable 35 ST to [C Between Cisco Router and Patch Panel (coming from STT) Data Room LSJ 1 HWICAGE-SFP_ WIC Card for SEP Cisco Router Data Room LSJ 1 MM Duplex ftheriraSC to LC Between Cisco Router and Patch Panel Data Room LSJ 1 GLC-SX-MM MM Fiber Module Cisco Router Data Room x Choice 1 GLC-SX-MM MM Fiber Module Cisco 3560 Building - Gym x Choice 1 Between Cisco 3560 and patch Panel Building - Gym LSJ 4 rackmount screws for Cisco 3560 Building - Gym LSJ 1 3560G-24 Cisco 3560 Building - Gym x Choice 1 356OG-24 Cisco 3560 Outside Cabinet x Choice 4 rackmount screws for Cisco 3560 Could use existing from nelgear Outside Cabinet LSJ Other Pending Items/Work Cross Connect Router Config Info Dragonwave Warrantee Info I STT Beach ViNGN LSJ EFTA01139447 Dragonwave Survey Includes Signal, Firmware, Hardware, Monitoring, Grounding Choice From: Cecile de Jongh Imei Sent Wednesday. November . To: Hector Cintron Cc: Omar Welch: Jermaine Subject Re: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Thank you Hector. On Nov 25. 2015. at 11:37 AM, Hector Cintron wrote: I can only comment about #3 3 — it should, this way I can do a fill integration of the ViNGN. Dragonwave backup. test failover. The plan that I would like to do: • install ViNGN via the new router. Test it and switch the island over this new connection (primary) • Once this is done I can takedown the Dragonwave connection to add some switches to be able to monitor the link and take over maintenance. Once this is complete • Reconnect the Dragonwave as secondary link • Test failover to Secondary (DW). The above plan has a 1-2 min downtime. If ViNGN is not ready I can still do the install but I need to install the switches needed to monitor the dragonwave there will be a downtime of a few hours as I do the swap but no testing will be done. Hector. From: Cecile de Jongh a Sent Wednesday. November 25.2015 10:40 To: Hector Cintron Cc: Omar Welch: Jermaine Subject Re: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Ok. 1. Does this still need to be scheduled with them? 2. II so. do we do that or do you? 3. Does this need to be done before Hector goes to the island or can it be done anytime afterwards? On Nov 25, 2015. at 10:19AM. Hector Cintron wrote: The crossover does require a visit to the Pole (the one in St Thomas at the beach) where VINGN connects to the fiber the goes to the Island. From: Cecile de Jongh Sent Wednesday. November 25.2015 10.17 To: Omar Welch Cc: Jermaine: Hector Cintron Subject Re: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Does this 'crossover require VINGN to visit the site or is it something that is done remotely from their office? On Nov 25, 2015. at 10:01 AM. Omar Welch wrote: Hi Cecie The connection does play a part in the delay until Monday but not the confirmation for today as no confirmation was made for today. We are assisting ViNGN to be ready for Monday. 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation.' On Nov 25, 2015. at 8:13 AM, Cecile de Jongh wrote: Email received from outside of the ATN domain. Use caution before using links/attachments. Good morning Omar and Hector. Has the date switched to Monday due to the fact that VINGN has not done the crossover? If so. why did Hector confirm today? Will VINGN complete the crossover by Monday? On Nov 25, 2015, at 9:02 AM. Jermaine < Pl"rote: Good day Omar I am not understanding this. As per my conversation. I stated Monday is too long. I started receiving emails from Hector concerning the installation shortly after. One of my last email was confirming tomorrow. Jruan EFTA01139448 From: Omar Welch Sent: Wednesday. Novem . To: Jean/rine Cc: Hector Cintrcn: Cece de Jongh Subject: Re: fCe project Jermaine per my message Hector will not be able to complete installation until Monday please make arrangements for this. Also we are still awaiting confirmation from VINGN on the cross connect. 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 24, 2015, at 3:32 PM, Jermaine .r wrote: Email received from outside of the ATN domain. Use caution before using links/attachments. Good Day Hector. Please be advised. all components are here in the office ready for installation tomorrow. Does VINGN have the crossover in place? Regards Jruan From: Hector Contron [medic. Sent: Tuesday. November 24. 2015 12:28 PM To: Jermane Ruan Cc: Omar Welch Subject RE. fiber project Hi Jerrnaine. Can you send me a list of the items you have for the install? I want to make sure we have everything before I head over there. Thanks. From: Hector Canyon Sent: Wednesday. November 11. 201510:17 To: *Jermaine Ruan' Cc: Omar Welch Subject RE: fiber project I cannot give you a date sense it's all based on the following: VINGN installs the cross connect ? whether we order the parts or LSJ order the parts. This was something that Omar was going to speak to (sorry I do not know the name) LSJ Finance. o For VINGN connection (Router Module. Fiber Module. Fiber cable) o Choice connection (switches, fiber cables) Also just an FYI I'll be going on vacation staling this Friday and I'll be back on Monday 20 so assuming all the above is installed. purchased and delivered by the time I get back it would be somata-no the week of the 20 Hector. From: Jermaine RuanNo [mato Sent: Wednesday. To: Hector Cintron Cc: Omar Welch Subject Re: fiber project Email received from outside of the ATN domain. Use caution before using links/attachments. Good morning gentlemen The principal is requesting a new date for the fiber. Do you have a suggested estimated time of completion? Regards Jruan Good evening all When is the new date for the connection so I can update my superiors Regards Jruan Sent from my iPhone On Nov 10. 2015. at 11:25 PM. Hector Cintron wrote: Hi Guys. I haven't received notifications that the items that we need to finish came in so that would be no. From: Omar Welch Sent: Tuesday. November 10. 2015 10:06 To: Jerrnaine Ruan: Hector Contron Subject: Re: fiber project Hector? EFTA01139449 'True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 10, 2015. at 6:44 PM. Jermaine Ruan wrote: Email received from outside of the ATN domain. Use caution before using links/attachments. Good night Omer Yep. I am trying to line up the runs in the morning Regards Jruan Sent from my iPhone On Nov 10. 2015. at 6:19 PM. Omar Welch wrote: To come to the island? "True leaders fortify themselves with thinkers and innovators, because yes men are only saying yes to self preservation." On Nov 10. 2015. at 6:10 PM. Jermaine wrote: Email received from outside of the ATN domain. Use caution before using linkstattachments. Good day ornar Is hector still on for tomorrow? Regards Jruan EFTA01139450
ℹ️ Document Details
SHA-256
1852ad98b758566d047a48471a1d8b81ebf3551ff85e435bfc00ebdb740d1d29
Bates Number
EFTA01139445
Dataset
DataSet-9
Type
document
Pages
6

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!