📄 Extracted Text (264 words)
From: jeffrey E. <[email protected]>
Sent: Thursday, July 5, 2018 5:21 PM
To: Larry Visoski
Subject: Re: Hell update
G4 your call
On Thu, Jul 5, 2018 at 1:15 PM Larry Visoski=< > wrote:
Jeffrey
Installing the blades now, bleeding the brakes,
I should be doing engine leak check ground runs and tail rotor drive shaft =alance by 4pm today„
If your schedule permits, we would do main rotor blade tracking all day tom=rrow,
I'll update you at 5pm today,
GIV update
Westfield accomplished engine runs earlier this week, GIV will be ready for=test flight mid next week, OR we
delay the test flight until after dual lo=ner engine install scheduled for July 15,
G550
Pete is finishing up G550 sink drain bushing install, and HEX drain valve h=ndle (like you wanted instead of the
Round hard to grip handle Eric instal=ed).
•• *installed 2 / 24" demo LED light bulbs in upwash for your viewin= when we depart PBI-STT.
Thx,
Larry
Sent from my iPhone
=AO please note
The information contained in this=communication is confidential, may be attorney-client privileged, mayconstitute
inside information, and is intended only for the use of the=addressee. It is the property of JEE Unauthorized use,
disclosure or=copying of this communication or any part thereof is strictly prohibite= and may be unlawful. If you have
received this communication in err=r, please notify us immediately by return e-mail or by e-mail to
[email protected]<=a>, and destroy this communication and all copies thereof, including=all attachments.
copyright -all rights reserved
--0000000000006fc540057043c62b-- conversation-id 391 date-last-viewed 0 date-received 1530811277 flags
8590195713 gmail-label-ids 7 remote-id 833771
EFTA_R1_01766110
EFTA02586147
ℹ️ Document Details
SHA-256
18b2f3ef15a72596bb17039d097090cefd0a4a0a4aa37ef83a4cf232894cf9fd
Bates Number
EFTA02586147
Dataset
DataSet-11
Document Type
document
Pages
1
Comments 0