EFTA02624242.pdf

DataSet-11 1 page 238 words document
V11
👁 1 💬 0
📄 Extracted Text (238 words)
From: Kyle reavis < > Sent: Tuesday, September 18, 2018 1:59 PM To: Jeffrey E. Subject: Re: Cabana 1 and 2 Work Schedule Yes Sir, if you would like I can see about having them wor= Saturday to keep pushing the schedule if not I will keep them on schedule=for Friday. Kyle =br> On Tue, Sep 18, 2018 at 6:55 AM, jeffrey E. =span dir="ltr"><[email protected] <mailto:[email protected]» wrote: Every one working please <=iv> =n Tue, Sep 18, 2018 at 9:09 AM Kyle reavis < > wrote: Good Morning Mr Epstein, I have work exterior wall stone work scheduled on Cabana 1an= 2 through Friday as of right now. I know you want these done as soo= as possible so I wanted to check if you want me to postpone them around y=ur schedule or keep them working through your visit. Thank you. Very Respectfully, Kyle W Rea=is please note Th= information contained in this communication is confidential, may be at=orney-client privileged, may constitute inside information, and is inte=ded only for the use of the addressee. It is the property of JEE =nauthorized use, disclosure or copying of this communication or any par= thereof is strictly prohibited and may be unlawful. If you have receiv=d this communication in error, please notify us immediately by retur= e-mail or by e-mail to [email protected] <mailto:[email protected]> , and destroy this communication and a=I copies thereof, including all attachments. copyright -all rights rese=ved EFTA_R1_01834357 EFTA02624242
ℹ️ Document Details
SHA-256
1afe8fa00cbe3bbef0dc2871593a924cc635d6b14e60739a0b7e179e715c3ccc
Bates Number
EFTA02624242
Dataset
DataSet-11
Type
document
Pages
1

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!