EFTA00748810.pdf
👁 1
💬 0
📄 Extracted Text (140 words)
From: "Silvina Royston" <MI=IMM>
To: "jeevacation®gmail.com" <jeevacation®gmail.com>
Cc: MIE" <S, "Curtis Royston"
Subject: Master Suite Expansion
Date: Wed, 15 Apr 2009 12:20:07 +0000
Attachments: Photo_LJPG; Photo_2.JPG; Photo_3.JPG; Photo_4.JPG; Photo_5.JPG
Jeffrey,
We staked out the footprint of the Master Suite expansion.
Please review attached photos. Orange sprayed line demarcates the perimeter of building.
As you can see from Photo #2, the new back wall is only several feet from existing electrical lines and
transformer equipment.
This affects:
Window at steam shower. We can:
a. Keep window as in Pinto elevation and build a wall to conceal equipment. This alleyway, about
4' deep, can be planted and we can grow vines on the wall for greenery.
b. Keep window but instead of clear glass install translucent glass for light, no view.
c. Eliminate window.
Let me know your thoughts.
Regards,
Silvina
EFTA00748810
ℹ️ Document Details
SHA-256
1d7a5717b2fca3c62ddea2315065666eb0da8da4806318836600a1cc5c69281d
Bates Number
EFTA00748810
Dataset
DataSet-9
Type
document
Pages
1
💬 Comments 0