T: Thr in mil m. v i n milcom];
rom: Lvjet
Sent: Mon 11/28/2011 3:12:20 AM
Subject: 8727 update
Jeffrey,
Terak from Qatar told me that his chairman will be in West Palm Beach on December 3rd to view the Boeing
727 and possibly take a demo flight, Chicago was mentioned as a possible destination. No firm demo flight date
has been established. I will gain your approval first,.
I will have more info early this week,. Don Bass and Terak requested a 4 year maintenance budget from Larry
Morrison,.
here is the email that Morrion prepared,. It has not been sent to buyer,. only fwd to Don Bass, at this time,.
Dear Don,
Per your request, and as follow up to our teleconference last week, please see the following maintenance
projections. While reviewing, please keep in mind that these are only projected estimates, and do not include
line maintenance and normal wear items. As well, keep in mind that these projections are based on average
findings and do not include extenuating circumstances.
January 2012: C 2C Check (General Description: Inspection Below Galleys, Lavatory's and Emergency Exits,
Fore and Aft Wing Spars) Estimated Cost: $420,000 3 weeks down time
February 2013: Lower Lobe and Bilge Inspection: (General Description: Requires removal and installation of
Aux. Fuel Tank System / History of this aircraft has had minimal findings in these zones, however, the removal
and installation of the tank system is labor intensive, 36mo. recurring). $300,000 3 weeks down time (note: all
eleven fuel cells were overhauled at last removal, thus cell conditions should be good) .
Engine No.2 HPC AD2003-12-07 (amd. 39-13192) (8 yr recurring) (Due 7/27/2013) $350,000.4 weeks down
time (however there are exchange options available for the -7B engine).
February 2014: C Check (General Description: Two year items) Estimated Cost $176,000 2 weeks down time.
Engines No.1 and No,3 HPC AD 2003-16-05 (amd.39-13258) (9 yr recurring) $350,000 each, 4 weeks down
time (Note: Lease as well as exchange engines are difficult to come by do to intermediate case modifications
required for the Super 27. In addition exchange engines are not recommended do to the very low hours and
cycles on the current set of engines).
I hope this helps to define the upcoming major maintenance events for N908JE. Once the 2014 Maintenance is
complete the aircraft wil be back on schedule with the MSG3 multiple of two program. In essence, aN
subsequent checks will be every 24 months, the following being 2016.
Best Regards,
Larry Morrison
Director of Maintence JEGE Inc.
EFTA_R1_00235192
EFTA01845734
ℹ️ Document Details
SHA-256
1daace5827e57fcca056d64ee878a49fbef05f7bfda57666ad5a5d48fcb9e531
Bates Number
EFTA01845734
Dataset
DataSet-10
Document Type
document
Pages
1
Comments 0