Construction Proposal
Quantum Vision Construction LLC
8168 Crown Bay Marina
Suite 505 PMB 260
St. Thomas, VI 00802
January 21', 2018
Owner: LSJE
Little St. James Island, VI
Project: Asphalt Pathways Paving Works
Little St. James Island, VI
SCOPE OF WORK:
• Prepare and grade existing sub base
• Eradicate and remove weeds and organic material from existing sub base.
• Compact sub base to insure stability
• Spread and compact 3 inches of owner-supplied aggregate base material
• Apply Tack Coat prior to asphalt concrete placement
• Place new 4-inch reinforced Portland cement concrete pathway
SPECIAL CONDITIONS:
• LSJ will remove, secure, and replace all stone and other border edges.
• LSJ will provide all ferry services and vehicular and equipment barging services to and from Little St. James Island.
• Aggregate base will be supplied by owner.
• Care will be taken throughout this project to minimally impact all existing areas on Little St. James Island that is not a
part of this project. However, it is understood that some damage will occur to existing landscaped areas and contractor
will not be responsible for replacement of these damaged areas while implementing normal construction procedures.
• Amount of $114,000.00 will be credited to owner on behalf Betteroads Asphalt LLC.
OPTION (NOT INCLUDED IN BASE PRICE):
• As shown on drawings entitled "Little St. James RV and Pedestrian Pathway Re-Surfacing Project" and dated September
18, 2014.
TOTAL BASE PRICE: $716,500.00
Little St. James Island Paving Page I of2
EFTA00809855
Construction Proposal
Project Table:
Name Description Quantity Unit Cost Unit Total Cost
Portland Cement
4-inch reinforced pathway 13.0(X) 561.00 S.Y. 5793.000.00
Concrete Pavement
3-inch course using owner
Excavation and
supplied aggregate base 13.0(X) 515.00 S.Y. $37.500.00
Sitework
material.
Intervention amount on behalf
Credit -$114.000.00 -5114.000.00
of Betteroads Asphalt LLC
Total Base Price $716,500.00
Option
Drainage Measures: As shown on drawings entitled "Link St. James RV and Pedestrian Pathway Re-Surfacing Project"
and dated September 18, 2014.
Concrete Swales Described above 32 S1.064.00 EA $34.048.00
Aggregate Base
Described above 32 S182AM EA 55.824.00
Pad
Rip Rap Detention
Described above 32 S202.00 EA 56.464.09
Area
Options Total $46,336.00
Little St. James Island Paving Page 2 of 2
EFTA00809856
ℹ️ Document Details
SHA-256
1e0f5b59c3d312377cfd797de95599c25abcea1f286e794aeb9b23e7578e2c6a
Bates Number
EFTA00809855
Dataset
DataSet-9
Document Type
document
Pages
2
Comments 0