EFTA00683793.pdf

DataSet-9 3 pages 583 words document
P23
👁 1 💬 0
📄 Extracted Text (583 words)
From: Warwick Wicksman < To: Gary Kerney CC: Tom Sze < >, " Subject: RE: flagpole pool Date: Wed, 23 Feb 2011 19:40:59 +0000 Ok. Will call you tomorrow around 10am LA time. Warwick Warwick Wicksman, AIA Principal Gensler From: Gary Kerney [mailto: Sent: Wednesday, February 23, 2011 11:36 AM To: Warwick Wicksman Cc: Gary Kerney; Tom Sze; Subject: Re: flagpole pool I was in physical therapy when you called ,any time tomorrow ok Sent from my iPhone On Feb 23, 2011, at 3:10 PM, "Warwick Wicksman" > wrote: Gary, Please let me know when we can speak about this more. I am concerned about just drawing something up, and having it built, with no real "design". I do not recommend building the pool house with no relationship to the design of the adjacent cabana structures. This will be pretty visible from above when Jeffrey flies in, and from the sea, and it needs to look right. I am available today until 12 LA time, or 2-4. Also tomorrow after 10am LA time. Thanks, Warwick Warwick Wicksman, AIA Principal Gensler EFTA00683793 From: Warwick Wicksman Sent: Wednesda Februa 23 2011 7:22 AM To: • Tom Sze Cc: leevacat [email protected]; ; Subject: Re: flagpole pool I'll get you a proposal for plans sections and elevations today. Thanks, Warwick Wicksman Principal Sent from my BlackBerry Device. From: Gary Kerney < To: Warwick Widcsman; Tom Sze Cc: leffre E stein <*eevacation gmail.com>; William Rowles < >; < > Sent: Wed Feb 23 07:20:27 2011 Subject: RE: flagpole pool Warwick It is a very simple building,and I gave you the design outline,' will do structuals here and we are using trusses.' would think you can get me a set of drawings in a couple days. Please call me Gary From: Warwick Wicksman [malt° Sent: Tue 2/22/2011 8:13 PM To: Gary Kerney; Tom Sze Cc: Jeffrey Epstein; William Rowles; Subject: RE: flagpole pool Gary, I got the sketches you sent, and attached is an updated plan sketch based on the new comments. But I am confused about what you are asking us to provide. Our proposal was for conceptual design. It sounds like you are jumping from that to permit drawings in one week. Is that what you now need? And who is engineering the building, including the slab and foundations? Thanks, Warwick Warwick Wicksman, AIA Princi al Gensler EFTA00683794 From: Gary Kerney [mailto Sent: Saturday, February 19, 2011 7:09 AM To: Wanvick Wicicsman; Tom Sze Cc: Jeffrey Epstein; William Rowles; Subject: flagpole pool Wawick Specifications for construction development drawings.I need a quick turn around ,can form slab next week. Revised bath and kitchen programs attached Revised site plan attached BUILDING block structure 10' ceiling plaster finish in and out truss roof insulated and cornmeal roofing same as main compound crown molding and copper gutter same as main compound roll down hurricane shutters on 8' sliding glass doors(jeffrey mirrored?) mechinacial awnning over sliding door all other doors slabs INTERIOR floors stained concrete floors manufactured kitchen cabinets 30" refrigerator 30"range Ice maker dbl. sink bath to be ceramic tile floor and shower(small 1"+-) wood vanity top,with vessel sink erotic shower fixtures all other American Standerd or eq. corner sconces in livingroom recess can liting all liting on dimmers all base wall outlets to be I/2 switched POOL current thinking to reflect on next generation of image review 10x30 shade structure one each side 2x2 plaster col's 9' high 10" thick solid top ( 2' overhang?) ceiling cans,col. sconces,ceiling fans EFTA00683795
ℹ️ Document Details
SHA-256
1eaa17663cc0b7ea87ee5db69a8fe2e93c68d69b14bfe4757a2586c88ec81fea
Bates Number
EFTA00683793
Dataset
DataSet-9
Type
document
Pages
3

Community Rating

Sign in to rate this document

📋 What Is This?

Loading…
Sign in to add a description

💬 Comments 0

Sign in to join the discussion
Loading comments…
Link copied!