i think GSJ makes sense as we have previously discuss
presented below are 2 GSJ quotes that i have not yet negotiated:
a) original - 207.2 kw at cost of 142,119 - per Brad and Brice and test run this sizing suits our needs currently as
of today but does not allow for any growth
b) revised - 310.8 kw at cost of 205,273 - this size will allow 50% growth at GSJ before we must use generator
for gaps..
not sure on your thoughts regarding LSJ and only 25% capability as we are currently connected to WAPA
please advise on how to proceed GSJ / LSJ
thank you
Richard Kahn
HBRK Associates Inc.
Begin forwarded message:
From: Richard Kahn tc >
Subject: Fwd: LSJ - GSJ Solar
Date: November 4, 2016 at 6:12:00 PM EDT
To: Jeffrey Epstein <[email protected]>
Cc: Brice Gordon <1
Attached are quotes I just quickly reviewed.
Assuming lsj price is negotiated to 400k and we save 25 percent of 20,000 monthly lsj bill that is savings of 5k
per month and 60k per year. I was told if we cannot use 30 percent federal tax credit they would deduct approx
20 percent off price so assume 320,000 total cost and now payback is 5.25 years.
Please advise. Thank you.
Richard Kahn
EFTA01062724
HBRK Associates Inc.
Begin forwarded message:
From:
Date: November 4, 2016 at 5:53:40 PM EDT
To: "Richard Kahn" , "brice gordon"
Cc: "Lsj Gsj" "Kevin Alvarez" "Patrick
Molesworth"
Subject: RE: Re: LSJ - GSJ Solar
Hi Rich,
Please see the following proposals for a net-metered solar array at LSJ and the battery bank retrofit for GSJ
GSJ pricing has been updated with new bulk pricing from Aquion as well as the addition of 4 new battery
inverters. I think we should replace them now because the new inverters are supported by Aquion and the
older ones are not. The old ones WILL work but for the sake of the entire system I recommend swapping
them out now and having a new 5yr warranty in place on the brains of the operation. I had a meeting with
Aquion today to go over the final design and they approved the system. GSJ would benefit from more solar
panels
Brice confirmed your WAPA meter is Commercial so we designed a system sized at 100kW AC / 150kW DC.
LSJ can handle 500 modules on all the roofs of the maintenance facility area. This includes the two concrete
buildings and the two metal structures. This array should decrease your bill by 25% and requires very little
maintenance. Our price is turn-key so everything is included in the price of the contract but we would like to
request the use of your barge during the construction process. All materials are in stock and ready to go.
Please let me know if you have any questions. Cheers.
Original Message
Subject: RE: Re: LSJ - GSJ Solar
From:
Date: 11/3/16 1:46 pm
To: "Richard Kahn" "brice gordon"
Cc: "Lsj Gsj"
Gentlemen,
I can be available for both times so pick one and I will be available. Thank you.
Original Message
Subject: Re: LSJ - GSJ Solar
From: "Richard Kahn" <
Date: 11/3/16 1:39 pm
To: "brice ordon"
Cc: "Lsj Gsj"
Can do 9:30am or 10:45am est
EFTA01062725
Will be on my cell and will need dial in or need to be patched in
Richard Kahn
HBRK Associates Inc.
On Nov 3, 2016, at 1:35 PM, brice gordon < > wrote:
Rich
Can you do a 10am EST conference call tomorrow
If time does not work, please advise
I will not be available between 10-11 am Mountain time
Thank you
Sent from my iPhone
EFTA01062726
ℹ️ Document Details
SHA-256
1ef7a0e0bf21cd189c39fde7f19e1b1764a8aa7a7b24137841b4d788c3f1ddb2
Bates Number
EFTA01062724
Dataset
DataSet-9
Document Type
document
Pages
3
Comments 0