EFTA02408480
EFTA02408482 DataSet-11
EFTA02408484

EFTA02408482.pdf

DataSet-11 2 pages 455 words document
P23
Open PDF directly ↗ View extracted text
👁 1 💬 0
📄 Extracted Text (455 words)
To: Warwick Wicksman Doug Schoettle[- Cc: Tom Sze ); Bryan Oakes( Ken-Hao Hsu[ I: Jeffrey [email protected] From: Gary Kerney Sent: Thur 8/5/2010 11:29:37 PM Subject: RE: LSJ Update Warwick These look good,well understand all the stairs in the screen complex better when we see the 3D renderings, as well the scale of the screening room :when the renderings are ready send to all. Thanks Gary From: Warwick Wicksman Sent: Thu 8/5/2010 6:17 PM To: Gary Kerney; Doug Schoettle Cc: Tom Sze; Bryan Oakes; Ken-Hao Hsu Subject: LSJ Update Gary, Please review these draft sketches, and let me know if you need me to add any more info before you present them to Mr. Epstein this weekend! I have not sent them to him yet. Ken-Hao will be sending you the 3D views later today - as soon as they are ready. I have attached the plan views only. With these sketches, we have exhausted the re-design services approved Work Authorization 1. These are intended to be programmatic conceptual drawings. When we move forward with the next phase, we will refine the layouts, and get into the details of the design. Please note: • The layouts are based upon previous Option 1, sent 7/28/10. • We have revised the exterior stairs and circulation per our discussions. • We have provided options for the Kitchen windows. • We have revised the road, to reflect the corrected site plan we received yesterday, EFTA_R1_01468245 EFTA02408482 8/4/10, with the relocated service road. Note, this did impact the previous layout a bit. • I added the door at the north end of the east wall of the kitchen addition, per my conversation with Doug this morning. The two "partial site plans" attached reflect the two different screening room sizes. One has a 30' screen, per our original design. The other has a 25' screen, as I discussed with Gary. I recommend someone mock up the two sizes for Mr. Epstein's review, perhaps in the living room, to confirm the desired screen size. The screening room area is not completely laid out, as we need to dig into the design of that area in greater detail, once we set the location and screen size. If this layout is approved, we can prepare a new proposal to provide complete construction documents, based on this layout, including all of our consultants. If we need to make minor adjustments, we can accommodate that as we move forward. If we need to make major adjustments, I can prepare a new proposal for additional conceptual re-design services. Please call me or email me if you have any questions! Thanks, Warwick Warwick Wicksman, AlA Princi al Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA EFTA_R1_01468246 EFTA02408483
ℹ️ Document Details
SHA-256
1fb8cbf40cb0ce981fa60a91989711d019286a3d7e2d58bc58ed7cef517400b8
Bates Number
EFTA02408482
Dataset
DataSet-11
Document Type
document
Pages
2

Comments 0

Loading comments…
Link copied!